Advanced search options

Advanced Search Options 🞨

Browse by author name (“Author name starts with…”).

Find ETDs with:

in
/  
in
/  
in
/  
in

Written in Published in Earliest date Latest date

Sorted by

Results per page:

You searched for subject:(Materialsatsning). One record found.

Search Limiters

Last 2 Years | English Only

No search limiters apply to these results.

▼ Search Limiters

1. Asad, Ahmed. Balansering och tidsoptimering av materialsatsning till F12-monteringen på Parker PMDE Trollhättan.

Degree: Avdelningen för produktionssystem (PS), 2016, University West

I industriföretag används managementverktyg för att utveckla och effektivisera verksamheten så att ledtider och slöseri reduceras i samtliga processer. Parker PMDE Trollhättan tillverkar hydraulikmaskiner. Sedan 90-talet har Parker bedrivit verksamhetsutveckling enligt management principer i Lean Production. Ett nästa steg i Parkers ständiga förbättringsarbete var att undersöka möjligheter att utveckla en materialsatsningsavdelning så att en person kan förse monteringen med material tillräckligt snabbt utan att extra resurser behöver tillsättas. I dagsläget råder det obalans gentemot takttider i monteringen och det tar längre tid för satsningen att plocka ihop fyra satser än vad det tar för monteringen att förbruka dessa satser.Målet med examensarbetet var att ta fram förbättringsförslag där en person får förutsättningar att plocka ihop material till montering av fyra hydraulikmaskiner på mindre än 16 minuter. Delmålen var att göra en kartläggning av tider och arbetsmoment vid satsningen. Avgränsningarna i projektet var att inte undersöka processer utanför satsningen. Examensarbetet utformades efter DMAIC-metodiken, som är en projektmodell för faktabaserad problemlösning och tydlig struktur. Metoderna som användes vid insamling av data var observationer och analys av videoinspelat material som utfördes i programvaran AviX Method. Videoinspelningarna kategoriserades som olika aktiviteter i satsningsprocessen där gång, plock, scannertid, förmontering och övrig tid var de största kategorierna. Arbetsmoment identifierades som var tidskrävande och ej tillförde värde i processen. Mätningarna låg till grund för generering av lösningsförslagen.Baserat på ovanstående resultat och med hjälp av brainstorming genererades lösningsförslag tillsammans med produktionstekniker och materialhanterare. De lösningsförslag som uppfyllde målet med projektet att plocka en 4-sats under 16 minuter var pick by voice, pick by light, ringscanner och flytt av kilpress. Pick by voice anses vara lösningen som företaget bör införa eftersom den reducerar plocktid, scannertid och är ett flexibelt system. Ytterligare två lösningsförslag togs fram som inte uppfyllde målet men uppfattas som värda för företaget att utreda vidare utifrån Lean Production och ergonomiska skäl. De lösningsförslagen som inte uppfyllde målen bestod av en förändring av plockrundan och införande av en magnetlyft.

In industries, the management tools of Lean Production are used to develop and streamline operations in a way to reduce waste and lead times in all processes. Parker PMDE in Trollhättan manufactures hydraulic machines. Since the 90´s, Parker has pursued business development under the management principles of Lean Production. One of the next steps in Parkers continuous improvement was to explore opportunities to develop a kitting department so that a worker could provide the assembly with the material quickly without surplus resources. In the current situation, there is an imbalance from the kitting station towards the tact times in the assembly station…

Subjects/Keywords: Kitting; Materialkitting; Lean; AviX Method; material flow; Pick by voice; Pick by light; Time studies; Time optimization; Balancing; Kitting; Materialsatsning; Lean; AviX Method; Materialflöde; Pick by voice; Pick by light; Tidsstudier; Tidsoptimering; Balansering

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

Asad, A. (2016). Balansering och tidsoptimering av materialsatsning till F12-monteringen på Parker PMDE Trollhättan. (Thesis). University West. Retrieved from http://urn.kb.se/resolve?urn=urn:nbn:se:hv:diva-9440

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

Chicago Manual of Style (16th Edition):

Asad, Ahmed. “Balansering och tidsoptimering av materialsatsning till F12-monteringen på Parker PMDE Trollhättan.” 2016. Thesis, University West. Accessed February 18, 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:hv:diva-9440.

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

MLA Handbook (7th Edition):

Asad, Ahmed. “Balansering och tidsoptimering av materialsatsning till F12-monteringen på Parker PMDE Trollhättan.” 2016. Web. 18 Feb 2020.

Vancouver:

Asad A. Balansering och tidsoptimering av materialsatsning till F12-monteringen på Parker PMDE Trollhättan. [Internet] [Thesis]. University West; 2016. [cited 2020 Feb 18]. Available from: http://urn.kb.se/resolve?urn=urn:nbn:se:hv:diva-9440.

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

Council of Science Editors:

Asad A. Balansering och tidsoptimering av materialsatsning till F12-monteringen på Parker PMDE Trollhättan. [Thesis]. University West; 2016. Available from: http://urn.kb.se/resolve?urn=urn:nbn:se:hv:diva-9440

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

.