Advanced search options
You searched for subject:(Machine setup)
.
Showing records 1 – 10 of
10 total matches.
▼ Search Limiters
University of Texas – Austin
1. -9907-6069. Simulation and optimization techniques applied in semiconductor assembly and test operations.
Degree: PhD, Operations research and industrial engineering, 2016, University of Texas – Austin
URL: http://hdl.handle.net/2152/40318
Subjects/Keywords: Semiconductor assembly and test; AutoSched; GRASP; Dispatch rules; Statistical analysis; Machine setup; Reentrant flow
Record Details
Similar Records
❌
APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager
APA (6th Edition):
-9907-6069. (2016). Simulation and optimization techniques applied in semiconductor assembly and test operations. (Doctoral Dissertation). University of Texas – Austin. Retrieved from http://hdl.handle.net/2152/40318
Note: this citation may be lacking information needed for this citation format:
Author name may be incomplete
Chicago Manual of Style (16th Edition):
-9907-6069. “Simulation and optimization techniques applied in semiconductor assembly and test operations.” 2016. Doctoral Dissertation, University of Texas – Austin. Accessed February 28, 2021. http://hdl.handle.net/2152/40318.
Note: this citation may be lacking information needed for this citation format:
Author name may be incomplete
MLA Handbook (7th Edition):
-9907-6069. “Simulation and optimization techniques applied in semiconductor assembly and test operations.” 2016. Web. 28 Feb 2021.
Note: this citation may be lacking information needed for this citation format:
Author name may be incomplete
Vancouver:
-9907-6069. Simulation and optimization techniques applied in semiconductor assembly and test operations. [Internet] [Doctoral dissertation]. University of Texas – Austin; 2016. [cited 2021 Feb 28]. Available from: http://hdl.handle.net/2152/40318.
Note: this citation may be lacking information needed for this citation format:
Author name may be incomplete
Council of Science Editors:
-9907-6069. Simulation and optimization techniques applied in semiconductor assembly and test operations. [Doctoral Dissertation]. University of Texas – Austin; 2016. Available from: http://hdl.handle.net/2152/40318
Note: this citation may be lacking information needed for this citation format:
Author name may be incomplete
Université Toulouse II – Le Mirail
2. Karabagli, Bilal. Vérification automatique des montages d'usinage par vision : application à la sécurisation de l'usinage : Vision-based automatic verification of machining setup : application to machine tools safety.
Degree: Docteur es, Systèmes industriels, 2013, Université Toulouse II – Le Mirail
URL: http://www.theses.fr/2013TOU20107
Subjects/Keywords: Machine outil à commande numérique; Détection de contours; Système expert flou; Segmentation d'image; Estimation de pose; Machining setup; Edges detection; Fuzzy logic; Image segmentation; Pose estimation
Record Details
Similar Records
❌
APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager
APA (6th Edition):
Karabagli, B. (2013). Vérification automatique des montages d'usinage par vision : application à la sécurisation de l'usinage : Vision-based automatic verification of machining setup : application to machine tools safety. (Doctoral Dissertation). Université Toulouse II – Le Mirail. Retrieved from http://www.theses.fr/2013TOU20107
Chicago Manual of Style (16th Edition):
Karabagli, Bilal. “Vérification automatique des montages d'usinage par vision : application à la sécurisation de l'usinage : Vision-based automatic verification of machining setup : application to machine tools safety.” 2013. Doctoral Dissertation, Université Toulouse II – Le Mirail. Accessed February 28, 2021. http://www.theses.fr/2013TOU20107.
MLA Handbook (7th Edition):
Karabagli, Bilal. “Vérification automatique des montages d'usinage par vision : application à la sécurisation de l'usinage : Vision-based automatic verification of machining setup : application to machine tools safety.” 2013. Web. 28 Feb 2021.
Vancouver:
Karabagli B. Vérification automatique des montages d'usinage par vision : application à la sécurisation de l'usinage : Vision-based automatic verification of machining setup : application to machine tools safety. [Internet] [Doctoral dissertation]. Université Toulouse II – Le Mirail; 2013. [cited 2021 Feb 28]. Available from: http://www.theses.fr/2013TOU20107.
Council of Science Editors:
Karabagli B. Vérification automatique des montages d'usinage par vision : application à la sécurisation de l'usinage : Vision-based automatic verification of machining setup : application to machine tools safety. [Doctoral Dissertation]. Université Toulouse II – Le Mirail; 2013. Available from: http://www.theses.fr/2013TOU20107
UNIVERSIDADE FEDERAL DE OURO PRETO
3. Matheus Nohra Haddad. ALGORITMOS HEURÃSTICOS HÃBRIDOS PARA O PROBLEMA DE SEQUENCIAMENTO EM MÃQUINAS PARALELAS NÃO-RELACIONADAS COM TEMPOS DE PREPARAÃÃO DEPENDENTES DA SEQUÃNCIA.
Degree: 2012, UNIVERSIDADE FEDERAL DE OURO PRETO
URL: http://www.tede.ufop.br/tde_busca/arquivo.php?codArquivo=978
Subjects/Keywords: Sequenciamento em mÃquinas paralelas; makespan; Iterated Local Search; Path Relinking; VND; GRASP; tempos de preparaÃÃo; unrelated parallel machine scheduling; makespan; Iterated Local Search; Path Relinking; VND; GRASP; setup times; MATEMATICA DA COMPUTACAO
Record Details
Similar Records
❌
APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager
APA (6th Edition):
Haddad, M. N. (2012). ALGORITMOS HEURÃSTICOS HÃBRIDOS PARA O PROBLEMA DE SEQUENCIAMENTO EM MÃQUINAS PARALELAS NÃO-RELACIONADAS COM TEMPOS DE PREPARAÃÃO DEPENDENTES DA SEQUÃNCIA. (Thesis). UNIVERSIDADE FEDERAL DE OURO PRETO. Retrieved from http://www.tede.ufop.br/tde_busca/arquivo.php?codArquivo=978
Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation
Chicago Manual of Style (16th Edition):
Haddad, Matheus Nohra. “ALGORITMOS HEURÃSTICOS HÃBRIDOS PARA O PROBLEMA DE SEQUENCIAMENTO EM MÃQUINAS PARALELAS NÃO-RELACIONADAS COM TEMPOS DE PREPARAÃÃO DEPENDENTES DA SEQUÃNCIA.” 2012. Thesis, UNIVERSIDADE FEDERAL DE OURO PRETO. Accessed February 28, 2021. http://www.tede.ufop.br/tde_busca/arquivo.php?codArquivo=978.
Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation
MLA Handbook (7th Edition):
Haddad, Matheus Nohra. “ALGORITMOS HEURÃSTICOS HÃBRIDOS PARA O PROBLEMA DE SEQUENCIAMENTO EM MÃQUINAS PARALELAS NÃO-RELACIONADAS COM TEMPOS DE PREPARAÃÃO DEPENDENTES DA SEQUÃNCIA.” 2012. Web. 28 Feb 2021.
Vancouver:
Haddad MN. ALGORITMOS HEURÃSTICOS HÃBRIDOS PARA O PROBLEMA DE SEQUENCIAMENTO EM MÃQUINAS PARALELAS NÃO-RELACIONADAS COM TEMPOS DE PREPARAÃÃO DEPENDENTES DA SEQUÃNCIA. [Internet] [Thesis]. UNIVERSIDADE FEDERAL DE OURO PRETO; 2012. [cited 2021 Feb 28]. Available from: http://www.tede.ufop.br/tde_busca/arquivo.php?codArquivo=978.
Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation
Council of Science Editors:
Haddad MN. ALGORITMOS HEURÃSTICOS HÃBRIDOS PARA O PROBLEMA DE SEQUENCIAMENTO EM MÃQUINAS PARALELAS NÃO-RELACIONADAS COM TEMPOS DE PREPARAÃÃO DEPENDENTES DA SEQUÃNCIA. [Thesis]. UNIVERSIDADE FEDERAL DE OURO PRETO; 2012. Available from: http://www.tede.ufop.br/tde_busca/arquivo.php?codArquivo=978
Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation
4. Xi, Yue. Heuristic Algorithms to Minimize Total Weighted Tardiness on the Single Machine and Identical Parallel Machines with Sequence Dependent Setup and Future Ready Time.
Degree: PhD, Engineering, 2013, University of Wisconsin – Milwaukee
URL: https://dc.uwm.edu/etd/184
Subjects/Keywords: Parallel Machines; Ready Time; Scheduling; Setup; Single Machine; Engineering; Industrial Engineering
…MACHINE AND IDENTICAL PARALLEL MACHINES WITH SEQUENCE DEPENDENT SETUP AND FUTURE READY TIME 1… …on the single machine scheduling and parallel machines scheduling assumes setup time can be… …scheduling. Machine dependency means that processing a job needs different setup times and… …of this section. 2.1 Single machine scheduling with sequence dependent setup This section… …reviews the single machine scheduling with sequence dependent setup to minimize tardiness…
Record Details
Similar Records
❌
APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager
APA (6th Edition):
Xi, Y. (2013). Heuristic Algorithms to Minimize Total Weighted Tardiness on the Single Machine and Identical Parallel Machines with Sequence Dependent Setup and Future Ready Time. (Doctoral Dissertation). University of Wisconsin – Milwaukee. Retrieved from https://dc.uwm.edu/etd/184
Chicago Manual of Style (16th Edition):
Xi, Yue. “Heuristic Algorithms to Minimize Total Weighted Tardiness on the Single Machine and Identical Parallel Machines with Sequence Dependent Setup and Future Ready Time.” 2013. Doctoral Dissertation, University of Wisconsin – Milwaukee. Accessed February 28, 2021. https://dc.uwm.edu/etd/184.
MLA Handbook (7th Edition):
Xi, Yue. “Heuristic Algorithms to Minimize Total Weighted Tardiness on the Single Machine and Identical Parallel Machines with Sequence Dependent Setup and Future Ready Time.” 2013. Web. 28 Feb 2021.
Vancouver:
Xi Y. Heuristic Algorithms to Minimize Total Weighted Tardiness on the Single Machine and Identical Parallel Machines with Sequence Dependent Setup and Future Ready Time. [Internet] [Doctoral dissertation]. University of Wisconsin – Milwaukee; 2013. [cited 2021 Feb 28]. Available from: https://dc.uwm.edu/etd/184.
Council of Science Editors:
Xi Y. Heuristic Algorithms to Minimize Total Weighted Tardiness on the Single Machine and Identical Parallel Machines with Sequence Dependent Setup and Future Ready Time. [Doctoral Dissertation]. University of Wisconsin – Milwaukee; 2013. Available from: https://dc.uwm.edu/etd/184
Brno University of Technology
5. Matěj, Kryštof. Realizace hrubé stavby bytového domu v Brně: Realization of the rough construction of a residential building in Brno.
Degree: 2018, Brno University of Technology
URL: http://hdl.handle.net/11012/84468
Subjects/Keywords: VELOX; ztracené bednění; bytový dům; hrubá vrchní stavba; položkový rozpočet; zařízení staveniště; strojní sestava; výkaz výměr; časový plán výstavby; bezpečnost práce; technologický předpis; VELOX; sacrificial formwork; apartment house; superstructure carcass; item budget; site plant; machine setup; bill of quantities; construction progress schedule; occupational safety; technological regulation
Record Details
Similar Records
❌
APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager
APA (6th Edition):
Matěj, K. (2018). Realizace hrubé stavby bytového domu v Brně: Realization of the rough construction of a residential building in Brno. (Thesis). Brno University of Technology. Retrieved from http://hdl.handle.net/11012/84468
Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation
Chicago Manual of Style (16th Edition):
Matěj, Kryštof. “Realizace hrubé stavby bytového domu v Brně: Realization of the rough construction of a residential building in Brno.” 2018. Thesis, Brno University of Technology. Accessed February 28, 2021. http://hdl.handle.net/11012/84468.
Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation
MLA Handbook (7th Edition):
Matěj, Kryštof. “Realizace hrubé stavby bytového domu v Brně: Realization of the rough construction of a residential building in Brno.” 2018. Web. 28 Feb 2021.
Vancouver:
Matěj K. Realizace hrubé stavby bytového domu v Brně: Realization of the rough construction of a residential building in Brno. [Internet] [Thesis]. Brno University of Technology; 2018. [cited 2021 Feb 28]. Available from: http://hdl.handle.net/11012/84468.
Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation
Council of Science Editors:
Matěj K. Realizace hrubé stavby bytového domu v Brně: Realization of the rough construction of a residential building in Brno. [Thesis]. Brno University of Technology; 2018. Available from: http://hdl.handle.net/11012/84468
Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation
Ohio University
6. Almasarwah, Najat E. Family Formation, Loading and Batch-Cyclic Flowshop Scheduling in Cellular Manufacturing Systems.
Degree: MS, Industrial and Systems Engineering (Engineering and Technology), 2017, Ohio University
URL: http://rave.ohiolink.edu/etdc/view?acc_num=ohiou1503605158270554
Subjects/Keywords: Engineering; Industrial Engineering; Batch-Cyclic Scheduling Method; Processing Time Dissimilarity Coefficient; Minimal Product Set; Subfamily Formation; Makespan; Modify Capacity Parameter; Shifting Bottleneck Machine; Mathematical Model; Zero Setup Time; Cell Reduction; Manual Calculation
Record Details
Similar Records
❌
APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager
APA (6th Edition):
Almasarwah, N. E. (2017). Family Formation, Loading and Batch-Cyclic Flowshop Scheduling in Cellular Manufacturing Systems. (Masters Thesis). Ohio University. Retrieved from http://rave.ohiolink.edu/etdc/view?acc_num=ohiou1503605158270554
Chicago Manual of Style (16th Edition):
Almasarwah, Najat E. “Family Formation, Loading and Batch-Cyclic Flowshop Scheduling in Cellular Manufacturing Systems.” 2017. Masters Thesis, Ohio University. Accessed February 28, 2021. http://rave.ohiolink.edu/etdc/view?acc_num=ohiou1503605158270554.
MLA Handbook (7th Edition):
Almasarwah, Najat E. “Family Formation, Loading and Batch-Cyclic Flowshop Scheduling in Cellular Manufacturing Systems.” 2017. Web. 28 Feb 2021.
Vancouver:
Almasarwah NE. Family Formation, Loading and Batch-Cyclic Flowshop Scheduling in Cellular Manufacturing Systems. [Internet] [Masters thesis]. Ohio University; 2017. [cited 2021 Feb 28]. Available from: http://rave.ohiolink.edu/etdc/view?acc_num=ohiou1503605158270554.
Council of Science Editors:
Almasarwah NE. Family Formation, Loading and Batch-Cyclic Flowshop Scheduling in Cellular Manufacturing Systems. [Masters Thesis]. Ohio University; 2017. Available from: http://rave.ohiolink.edu/etdc/view?acc_num=ohiou1503605158270554
Brno University of Technology
7. Štípa, David. Řešení technologické etapy hrubé vrchní stavby školky v Habrech: Technological phase of the upper structure of the nursery building in Habry.
Degree: 2019, Brno University of Technology
URL: http://hdl.handle.net/11012/84679
Subjects/Keywords: Liapor; stropní panel; technologický postup; kontrolní a zkušební plán; hrubá vrchní stavba; strojní sestava; staveniště; pracoviště; zdění; monolitická deska; bezpečnost a ochrana zdraví při práci; Liapor; ceiling panel; technological procedure; Inspection and check plan; rough upper structure; machine setup; building site; workplace; walling; monolithic slab; safety and protection of health during work.
Record Details
Similar Records
❌
APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager
APA (6th Edition):
Štípa, D. (2019). Řešení technologické etapy hrubé vrchní stavby školky v Habrech: Technological phase of the upper structure of the nursery building in Habry. (Thesis). Brno University of Technology. Retrieved from http://hdl.handle.net/11012/84679
Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation
Chicago Manual of Style (16th Edition):
Štípa, David. “Řešení technologické etapy hrubé vrchní stavby školky v Habrech: Technological phase of the upper structure of the nursery building in Habry.” 2019. Thesis, Brno University of Technology. Accessed February 28, 2021. http://hdl.handle.net/11012/84679.
Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation
MLA Handbook (7th Edition):
Štípa, David. “Řešení technologické etapy hrubé vrchní stavby školky v Habrech: Technological phase of the upper structure of the nursery building in Habry.” 2019. Web. 28 Feb 2021.
Vancouver:
Štípa D. Řešení technologické etapy hrubé vrchní stavby školky v Habrech: Technological phase of the upper structure of the nursery building in Habry. [Internet] [Thesis]. Brno University of Technology; 2019. [cited 2021 Feb 28]. Available from: http://hdl.handle.net/11012/84679.
Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation
Council of Science Editors:
Štípa D. Řešení technologické etapy hrubé vrchní stavby školky v Habrech: Technological phase of the upper structure of the nursery building in Habry. [Thesis]. Brno University of Technology; 2019. Available from: http://hdl.handle.net/11012/84679
Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation
Brno University of Technology
8. Lisý, Ondřej. Stavebně technologický projekt ayurvédského pavilonu v Počátkách: Construction-technological project of Ayurvedic pavilion in Počátky.
Degree: 2020, Brno University of Technology
URL: http://hdl.handle.net/11012/184412
Subjects/Keywords: Realizace Ayurvédského pavilonu; hrubá vrchní stavba; zastřešení; technická zpráva; výkaz výměr; technologický pře dpis; položkový rozpočet; časový plán; strojní sestava; zařízení staveniště; kontrolní a zkušební plán; bezpečnost práce; realization of an Ayurvedic pavilion gross superstructure; roofing; technical report; bill of quantities; techno logical regulation; item budget; schedule; machine setup; construction site equipment; control and test schedule; safety regulation at work
Record Details
Similar Records
❌
APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager
APA (6th Edition):
Lisý, O. (2020). Stavebně technologický projekt ayurvédského pavilonu v Počátkách: Construction-technological project of Ayurvedic pavilion in Počátky. (Thesis). Brno University of Technology. Retrieved from http://hdl.handle.net/11012/184412
Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation
Chicago Manual of Style (16th Edition):
Lisý, Ondřej. “Stavebně technologický projekt ayurvédského pavilonu v Počátkách: Construction-technological project of Ayurvedic pavilion in Počátky.” 2020. Thesis, Brno University of Technology. Accessed February 28, 2021. http://hdl.handle.net/11012/184412.
Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation
MLA Handbook (7th Edition):
Lisý, Ondřej. “Stavebně technologický projekt ayurvédského pavilonu v Počátkách: Construction-technological project of Ayurvedic pavilion in Počátky.” 2020. Web. 28 Feb 2021.
Vancouver:
Lisý O. Stavebně technologický projekt ayurvédského pavilonu v Počátkách: Construction-technological project of Ayurvedic pavilion in Počátky. [Internet] [Thesis]. Brno University of Technology; 2020. [cited 2021 Feb 28]. Available from: http://hdl.handle.net/11012/184412.
Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation
Council of Science Editors:
Lisý O. Stavebně technologický projekt ayurvédského pavilonu v Počátkách: Construction-technological project of Ayurvedic pavilion in Počátky. [Thesis]. Brno University of Technology; 2020. Available from: http://hdl.handle.net/11012/184412
Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation
Brno University of Technology
9. Lisý, Ondřej. Resort Johanka - realizace hrubé vrchní stavby: Resort Johanka - realization of rough upper construction.
Degree: 2019, Brno University of Technology
URL: http://hdl.handle.net/11012/84505
Subjects/Keywords: Vestavba s ubytovacím podkrovím; hrubá vrchní stavba; zastřešení; technická zpráva; ocelové rámy; výkaz výměr; technologický předpis; položkový rozpočet; časový plán; strojní sestava; zařízení staveniště; kontrolní a zkušební plán; bezpečnost práce; built-in with attic accommodation; gross superstructure; roofing; technical report; steel framing; bill of quantities; technological regulation; item budget; schedule; machine setup; construction site equipment; control and test schedule; safety regulation at work
Record Details
Similar Records
❌
APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager
APA (6th Edition):
Lisý, O. (2019). Resort Johanka - realizace hrubé vrchní stavby: Resort Johanka - realization of rough upper construction. (Thesis). Brno University of Technology. Retrieved from http://hdl.handle.net/11012/84505
Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation
Chicago Manual of Style (16th Edition):
Lisý, Ondřej. “Resort Johanka - realizace hrubé vrchní stavby: Resort Johanka - realization of rough upper construction.” 2019. Thesis, Brno University of Technology. Accessed February 28, 2021. http://hdl.handle.net/11012/84505.
Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation
MLA Handbook (7th Edition):
Lisý, Ondřej. “Resort Johanka - realizace hrubé vrchní stavby: Resort Johanka - realization of rough upper construction.” 2019. Web. 28 Feb 2021.
Vancouver:
Lisý O. Resort Johanka - realizace hrubé vrchní stavby: Resort Johanka - realization of rough upper construction. [Internet] [Thesis]. Brno University of Technology; 2019. [cited 2021 Feb 28]. Available from: http://hdl.handle.net/11012/84505.
Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation
Council of Science Editors:
Lisý O. Resort Johanka - realizace hrubé vrchní stavby: Resort Johanka - realization of rough upper construction. [Thesis]. Brno University of Technology; 2019. Available from: http://hdl.handle.net/11012/84505
Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation
10. Gao, Zhufeng. Assembly and test operations with multipass requirement in semiconductor manufacturing.
Degree: PhD, Operations Research & Industrial Engineering, 2014, University of Texas – Austin
URL: http://hdl.handle.net/2152/24901
Subjects/Keywords: Semiconductor manufacturing; Assembly and test; Re-entrant flow; Optimization; Machine setup; Reactive GRASP; Heuristics; Assignment model; Sequencing; Mixed-integer programming; Real-time control
…the machine setup times were sequentially dependent. The objective was to minimize the total… …which is categorized by family type. During machine setup, tooling is placed on the machine… …operate at one temperature, but also be re-setup after the machine finishing all the lots… …SN0806054PWPR, there is preferred setup and four alternatives. The main setup uses machine family ETS… …considers at most one setup for each machine. A critical assumption is that all machines are idle…
Record Details
Similar Records
❌
APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager
APA (6th Edition):
Gao, Z. (2014). Assembly and test operations with multipass requirement in semiconductor manufacturing. (Doctoral Dissertation). University of Texas – Austin. Retrieved from http://hdl.handle.net/2152/24901
Chicago Manual of Style (16th Edition):
Gao, Zhufeng. “Assembly and test operations with multipass requirement in semiconductor manufacturing.” 2014. Doctoral Dissertation, University of Texas – Austin. Accessed February 28, 2021. http://hdl.handle.net/2152/24901.
MLA Handbook (7th Edition):
Gao, Zhufeng. “Assembly and test operations with multipass requirement in semiconductor manufacturing.” 2014. Web. 28 Feb 2021.
Vancouver:
Gao Z. Assembly and test operations with multipass requirement in semiconductor manufacturing. [Internet] [Doctoral dissertation]. University of Texas – Austin; 2014. [cited 2021 Feb 28]. Available from: http://hdl.handle.net/2152/24901.
Council of Science Editors:
Gao Z. Assembly and test operations with multipass requirement in semiconductor manufacturing. [Doctoral Dissertation]. University of Texas – Austin; 2014. Available from: http://hdl.handle.net/2152/24901