Advanced search options

Advanced Search Options 🞨

Browse by author name (“Author name starts with…”).

Find ETDs with:

in
/  
in
/  
in
/  
in

Written in Published in Earliest date Latest date

Sorted by

Results per page:

Sorted by: relevance · author · university · dateNew search

You searched for subject:(Machine setup). Showing records 1 – 10 of 10 total matches.

Search Limiters

Last 2 Years | English Only

No search limiters apply to these results.

▼ Search Limiters


University of Texas – Austin

1. -9907-6069. Simulation and optimization techniques applied in semiconductor assembly and test operations.

Degree: PhD, Operations research and industrial engineering, 2016, University of Texas – Austin

 The importance of back-end operations in semiconductor manufacturing has been growing steadily in the face of higher customer expectations and stronger competition in the industry.… (more)

Subjects/Keywords: Semiconductor assembly and test; AutoSched; GRASP; Dispatch rules; Statistical analysis; Machine setup; Reentrant flow

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

-9907-6069. (2016). Simulation and optimization techniques applied in semiconductor assembly and test operations. (Doctoral Dissertation). University of Texas – Austin. Retrieved from http://hdl.handle.net/2152/40318

Note: this citation may be lacking information needed for this citation format:
Author name may be incomplete

Chicago Manual of Style (16th Edition):

-9907-6069. “Simulation and optimization techniques applied in semiconductor assembly and test operations.” 2016. Doctoral Dissertation, University of Texas – Austin. Accessed February 28, 2021. http://hdl.handle.net/2152/40318.

Note: this citation may be lacking information needed for this citation format:
Author name may be incomplete

MLA Handbook (7th Edition):

-9907-6069. “Simulation and optimization techniques applied in semiconductor assembly and test operations.” 2016. Web. 28 Feb 2021.

Note: this citation may be lacking information needed for this citation format:
Author name may be incomplete

Vancouver:

-9907-6069. Simulation and optimization techniques applied in semiconductor assembly and test operations. [Internet] [Doctoral dissertation]. University of Texas – Austin; 2016. [cited 2021 Feb 28]. Available from: http://hdl.handle.net/2152/40318.

Note: this citation may be lacking information needed for this citation format:
Author name may be incomplete

Council of Science Editors:

-9907-6069. Simulation and optimization techniques applied in semiconductor assembly and test operations. [Doctoral Dissertation]. University of Texas – Austin; 2016. Available from: http://hdl.handle.net/2152/40318

Note: this citation may be lacking information needed for this citation format:
Author name may be incomplete


Université Toulouse II – Le Mirail

2. Karabagli, Bilal. Vérification automatique des montages d'usinage par vision : application à la sécurisation de l'usinage : Vision-based automatic verification of machining setup : application to machine tools safety.

Degree: Docteur es, Systèmes industriels, 2013, Université Toulouse II – Le Mirail

Le terme "usinage à porte fermée", fréquemment employé par les PME de l’aéronautique et de l’automobile, désigne l’automatisation sécurisée du processus d’usinage des pièces mécaniques.… (more)

Subjects/Keywords: Machine outil à commande numérique; Détection de contours; Système expert flou; Segmentation d'image; Estimation de pose; Machining setup; Edges detection; Fuzzy logic; Image segmentation; Pose estimation

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

Karabagli, B. (2013). Vérification automatique des montages d'usinage par vision : application à la sécurisation de l'usinage : Vision-based automatic verification of machining setup : application to machine tools safety. (Doctoral Dissertation). Université Toulouse II – Le Mirail. Retrieved from http://www.theses.fr/2013TOU20107

Chicago Manual of Style (16th Edition):

Karabagli, Bilal. “Vérification automatique des montages d'usinage par vision : application à la sécurisation de l'usinage : Vision-based automatic verification of machining setup : application to machine tools safety.” 2013. Doctoral Dissertation, Université Toulouse II – Le Mirail. Accessed February 28, 2021. http://www.theses.fr/2013TOU20107.

MLA Handbook (7th Edition):

Karabagli, Bilal. “Vérification automatique des montages d'usinage par vision : application à la sécurisation de l'usinage : Vision-based automatic verification of machining setup : application to machine tools safety.” 2013. Web. 28 Feb 2021.

Vancouver:

Karabagli B. Vérification automatique des montages d'usinage par vision : application à la sécurisation de l'usinage : Vision-based automatic verification of machining setup : application to machine tools safety. [Internet] [Doctoral dissertation]. Université Toulouse II – Le Mirail; 2013. [cited 2021 Feb 28]. Available from: http://www.theses.fr/2013TOU20107.

Council of Science Editors:

Karabagli B. Vérification automatique des montages d'usinage par vision : application à la sécurisation de l'usinage : Vision-based automatic verification of machining setup : application to machine tools safety. [Doctoral Dissertation]. Université Toulouse II – Le Mirail; 2013. Available from: http://www.theses.fr/2013TOU20107


UNIVERSIDADE FEDERAL DE OURO PRETO

3. Matheus Nohra Haddad. ALGORITMOS HEURÃSTICOS HÃBRIDOS PARA O PROBLEMA DE SEQUENCIAMENTO EM MÃQUINAS PARALELAS NÃO-RELACIONADAS COM TEMPOS DE PREPARAÃÃO DEPENDENTES DA SEQUÃNCIA.

Degree: 2012, UNIVERSIDADE FEDERAL DE OURO PRETO

Este trabalho aborda o problema de sequenciamento em mÃquinas paralelas nÃorelacionadas com tempos de preparaÃÃo dependentes da sequÃncia, do inglÃs Unrelated Parallel Machine Scheduling Problem… (more)

Subjects/Keywords: Sequenciamento em mÃquinas paralelas; makespan; Iterated Local Search; Path Relinking; VND; GRASP; tempos de preparaÃÃo; unrelated parallel machine scheduling; makespan; Iterated Local Search; Path Relinking; VND; GRASP; setup times; MATEMATICA DA COMPUTACAO

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

Haddad, M. N. (2012). ALGORITMOS HEURÃSTICOS HÃBRIDOS PARA O PROBLEMA DE SEQUENCIAMENTO EM MÃQUINAS PARALELAS NÃO-RELACIONADAS COM TEMPOS DE PREPARAÃÃO DEPENDENTES DA SEQUÃNCIA. (Thesis). UNIVERSIDADE FEDERAL DE OURO PRETO. Retrieved from http://www.tede.ufop.br/tde_busca/arquivo.php?codArquivo=978

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

Chicago Manual of Style (16th Edition):

Haddad, Matheus Nohra. “ALGORITMOS HEURÃSTICOS HÃBRIDOS PARA O PROBLEMA DE SEQUENCIAMENTO EM MÃQUINAS PARALELAS NÃO-RELACIONADAS COM TEMPOS DE PREPARAÃÃO DEPENDENTES DA SEQUÃNCIA.” 2012. Thesis, UNIVERSIDADE FEDERAL DE OURO PRETO. Accessed February 28, 2021. http://www.tede.ufop.br/tde_busca/arquivo.php?codArquivo=978.

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

MLA Handbook (7th Edition):

Haddad, Matheus Nohra. “ALGORITMOS HEURÃSTICOS HÃBRIDOS PARA O PROBLEMA DE SEQUENCIAMENTO EM MÃQUINAS PARALELAS NÃO-RELACIONADAS COM TEMPOS DE PREPARAÃÃO DEPENDENTES DA SEQUÃNCIA.” 2012. Web. 28 Feb 2021.

Vancouver:

Haddad MN. ALGORITMOS HEURÃSTICOS HÃBRIDOS PARA O PROBLEMA DE SEQUENCIAMENTO EM MÃQUINAS PARALELAS NÃO-RELACIONADAS COM TEMPOS DE PREPARAÃÃO DEPENDENTES DA SEQUÃNCIA. [Internet] [Thesis]. UNIVERSIDADE FEDERAL DE OURO PRETO; 2012. [cited 2021 Feb 28]. Available from: http://www.tede.ufop.br/tde_busca/arquivo.php?codArquivo=978.

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

Council of Science Editors:

Haddad MN. ALGORITMOS HEURÃSTICOS HÃBRIDOS PARA O PROBLEMA DE SEQUENCIAMENTO EM MÃQUINAS PARALELAS NÃO-RELACIONADAS COM TEMPOS DE PREPARAÃÃO DEPENDENTES DA SEQUÃNCIA. [Thesis]. UNIVERSIDADE FEDERAL DE OURO PRETO; 2012. Available from: http://www.tede.ufop.br/tde_busca/arquivo.php?codArquivo=978

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

4. Xi, Yue. Heuristic Algorithms to Minimize Total Weighted Tardiness on the Single Machine and Identical Parallel Machines with Sequence Dependent Setup and Future Ready Time.

Degree: PhD, Engineering, 2013, University of Wisconsin – Milwaukee

  This study generates heuristic algorithms to minimize the total weighted tardiness on the single machine and identical parallel machines with sequence dependent setup and… (more)

Subjects/Keywords: Parallel Machines; Ready Time; Scheduling; Setup; Single Machine; Engineering; Industrial Engineering

MACHINE AND IDENTICAL PARALLEL MACHINES WITH SEQUENCE DEPENDENT SETUP AND FUTURE READY TIME 1… …on the single machine scheduling and parallel machines scheduling assumes setup time can be… …scheduling. Machine dependency means that processing a job needs different setup times and… …of this section. 2.1 Single machine scheduling with sequence dependent setup This section… …reviews the single machine scheduling with sequence dependent setup to minimize tardiness… 

Page 1 Page 2 Page 3 Page 4 Page 5 Page 6 Page 7

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

Xi, Y. (2013). Heuristic Algorithms to Minimize Total Weighted Tardiness on the Single Machine and Identical Parallel Machines with Sequence Dependent Setup and Future Ready Time. (Doctoral Dissertation). University of Wisconsin – Milwaukee. Retrieved from https://dc.uwm.edu/etd/184

Chicago Manual of Style (16th Edition):

Xi, Yue. “Heuristic Algorithms to Minimize Total Weighted Tardiness on the Single Machine and Identical Parallel Machines with Sequence Dependent Setup and Future Ready Time.” 2013. Doctoral Dissertation, University of Wisconsin – Milwaukee. Accessed February 28, 2021. https://dc.uwm.edu/etd/184.

MLA Handbook (7th Edition):

Xi, Yue. “Heuristic Algorithms to Minimize Total Weighted Tardiness on the Single Machine and Identical Parallel Machines with Sequence Dependent Setup and Future Ready Time.” 2013. Web. 28 Feb 2021.

Vancouver:

Xi Y. Heuristic Algorithms to Minimize Total Weighted Tardiness on the Single Machine and Identical Parallel Machines with Sequence Dependent Setup and Future Ready Time. [Internet] [Doctoral dissertation]. University of Wisconsin – Milwaukee; 2013. [cited 2021 Feb 28]. Available from: https://dc.uwm.edu/etd/184.

Council of Science Editors:

Xi Y. Heuristic Algorithms to Minimize Total Weighted Tardiness on the Single Machine and Identical Parallel Machines with Sequence Dependent Setup and Future Ready Time. [Doctoral Dissertation]. University of Wisconsin – Milwaukee; 2013. Available from: https://dc.uwm.edu/etd/184


Brno University of Technology

5. Matěj, Kryštof. Realizace hrubé stavby bytového domu v Brně: Realization of the rough construction of a residential building in Brno.

Degree: 2018, Brno University of Technology

 The subject of the Bachelor Thesis is the technological stage of the superstructure carcass of an apartment house in Brno. For this stage, the following… (more)

Subjects/Keywords: VELOX; ztracené bednění; bytový dům; hrubá vrchní stavba; položkový rozpočet; zařízení staveniště; strojní sestava; výkaz výměr; časový plán výstavby; bezpečnost práce; technologický předpis; VELOX; sacrificial formwork; apartment house; superstructure carcass; item budget; site plant; machine setup; bill of quantities; construction progress schedule; occupational safety; technological regulation

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

Matěj, K. (2018). Realizace hrubé stavby bytového domu v Brně: Realization of the rough construction of a residential building in Brno. (Thesis). Brno University of Technology. Retrieved from http://hdl.handle.net/11012/84468

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

Chicago Manual of Style (16th Edition):

Matěj, Kryštof. “Realizace hrubé stavby bytového domu v Brně: Realization of the rough construction of a residential building in Brno.” 2018. Thesis, Brno University of Technology. Accessed February 28, 2021. http://hdl.handle.net/11012/84468.

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

MLA Handbook (7th Edition):

Matěj, Kryštof. “Realizace hrubé stavby bytového domu v Brně: Realization of the rough construction of a residential building in Brno.” 2018. Web. 28 Feb 2021.

Vancouver:

Matěj K. Realizace hrubé stavby bytového domu v Brně: Realization of the rough construction of a residential building in Brno. [Internet] [Thesis]. Brno University of Technology; 2018. [cited 2021 Feb 28]. Available from: http://hdl.handle.net/11012/84468.

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

Council of Science Editors:

Matěj K. Realizace hrubé stavby bytového domu v Brně: Realization of the rough construction of a residential building in Brno. [Thesis]. Brno University of Technology; 2018. Available from: http://hdl.handle.net/11012/84468

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation


Ohio University

6. Almasarwah, Najat E. Family Formation, Loading and Batch-Cyclic Flowshop Scheduling in Cellular Manufacturing Systems.

Degree: MS, Industrial and Systems Engineering (Engineering and Technology), 2017, Ohio University

 In many cellular manufacturing systems, cells have flowshop scheduling characteristics. Most flowshop scheduling methods appeared in the literature assume that products are processed in batch… (more)

Subjects/Keywords: Engineering; Industrial Engineering; Batch-Cyclic Scheduling Method; Processing Time Dissimilarity Coefficient; Minimal Product Set; Subfamily Formation; Makespan; Modify Capacity Parameter; Shifting Bottleneck Machine; Mathematical Model; Zero Setup Time; Cell Reduction; Manual Calculation

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

Almasarwah, N. E. (2017). Family Formation, Loading and Batch-Cyclic Flowshop Scheduling in Cellular Manufacturing Systems. (Masters Thesis). Ohio University. Retrieved from http://rave.ohiolink.edu/etdc/view?acc_num=ohiou1503605158270554

Chicago Manual of Style (16th Edition):

Almasarwah, Najat E. “Family Formation, Loading and Batch-Cyclic Flowshop Scheduling in Cellular Manufacturing Systems.” 2017. Masters Thesis, Ohio University. Accessed February 28, 2021. http://rave.ohiolink.edu/etdc/view?acc_num=ohiou1503605158270554.

MLA Handbook (7th Edition):

Almasarwah, Najat E. “Family Formation, Loading and Batch-Cyclic Flowshop Scheduling in Cellular Manufacturing Systems.” 2017. Web. 28 Feb 2021.

Vancouver:

Almasarwah NE. Family Formation, Loading and Batch-Cyclic Flowshop Scheduling in Cellular Manufacturing Systems. [Internet] [Masters thesis]. Ohio University; 2017. [cited 2021 Feb 28]. Available from: http://rave.ohiolink.edu/etdc/view?acc_num=ohiou1503605158270554.

Council of Science Editors:

Almasarwah NE. Family Formation, Loading and Batch-Cyclic Flowshop Scheduling in Cellular Manufacturing Systems. [Masters Thesis]. Ohio University; 2017. Available from: http://rave.ohiolink.edu/etdc/view?acc_num=ohiou1503605158270554


Brno University of Technology

7. Štípa, David. Řešení technologické etapy hrubé vrchní stavby školky v Habrech: Technological phase of the upper structure of the nursery building in Habry.

Degree: 2019, Brno University of Technology

 The aim of the bachelor thesis is a technological solution of rough upper structure of a kindergarden in Habry. The main aim of the thesis… (more)

Subjects/Keywords: Liapor; stropní panel; technologický postup; kontrolní a zkušební plán; hrubá vrchní stavba; strojní sestava; staveniště; pracoviště; zdění; monolitická deska; bezpečnost a ochrana zdraví při práci; Liapor; ceiling panel; technological procedure; Inspection and check plan; rough upper structure; machine setup; building site; workplace; walling; monolithic slab; safety and protection of health during work.

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

Štípa, D. (2019). Řešení technologické etapy hrubé vrchní stavby školky v Habrech: Technological phase of the upper structure of the nursery building in Habry. (Thesis). Brno University of Technology. Retrieved from http://hdl.handle.net/11012/84679

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

Chicago Manual of Style (16th Edition):

Štípa, David. “Řešení technologické etapy hrubé vrchní stavby školky v Habrech: Technological phase of the upper structure of the nursery building in Habry.” 2019. Thesis, Brno University of Technology. Accessed February 28, 2021. http://hdl.handle.net/11012/84679.

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

MLA Handbook (7th Edition):

Štípa, David. “Řešení technologické etapy hrubé vrchní stavby školky v Habrech: Technological phase of the upper structure of the nursery building in Habry.” 2019. Web. 28 Feb 2021.

Vancouver:

Štípa D. Řešení technologické etapy hrubé vrchní stavby školky v Habrech: Technological phase of the upper structure of the nursery building in Habry. [Internet] [Thesis]. Brno University of Technology; 2019. [cited 2021 Feb 28]. Available from: http://hdl.handle.net/11012/84679.

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

Council of Science Editors:

Štípa D. Řešení technologické etapy hrubé vrchní stavby školky v Habrech: Technological phase of the upper structure of the nursery building in Habry. [Thesis]. Brno University of Technology; 2019. Available from: http://hdl.handle.net/11012/84679

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation


Brno University of Technology

8. Lisý, Ondřej. Stavebně technologický projekt ayurvédského pavilonu v Počátkách: Construction-technological project of Ayurvedic pavilion in Počátky.

Degree: 2020, Brno University of Technology

 The diploma thesis deals with realization of an Ayurvedic pavilion in the premises of Saint Katerina Resort. The proposed new compound is designed to extend… (more)

Subjects/Keywords: Realizace Ayurvédského pavilonu; hrubá vrchní stavba; zastřešení; technická zpráva; výkaz výměr; technologický pře dpis; položkový rozpočet; časový plán; strojní sestava; zařízení staveniště; kontrolní a zkušební plán; bezpečnost práce; realization of an Ayurvedic pavilion gross superstructure; roofing; technical report; bill of quantities; techno logical regulation; item budget; schedule; machine setup; construction site equipment; control and test schedule; safety regulation at work

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

Lisý, O. (2020). Stavebně technologický projekt ayurvédského pavilonu v Počátkách: Construction-technological project of Ayurvedic pavilion in Počátky. (Thesis). Brno University of Technology. Retrieved from http://hdl.handle.net/11012/184412

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

Chicago Manual of Style (16th Edition):

Lisý, Ondřej. “Stavebně technologický projekt ayurvédského pavilonu v Počátkách: Construction-technological project of Ayurvedic pavilion in Počátky.” 2020. Thesis, Brno University of Technology. Accessed February 28, 2021. http://hdl.handle.net/11012/184412.

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

MLA Handbook (7th Edition):

Lisý, Ondřej. “Stavebně technologický projekt ayurvédského pavilonu v Počátkách: Construction-technological project of Ayurvedic pavilion in Počátky.” 2020. Web. 28 Feb 2021.

Vancouver:

Lisý O. Stavebně technologický projekt ayurvédského pavilonu v Počátkách: Construction-technological project of Ayurvedic pavilion in Počátky. [Internet] [Thesis]. Brno University of Technology; 2020. [cited 2021 Feb 28]. Available from: http://hdl.handle.net/11012/184412.

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

Council of Science Editors:

Lisý O. Stavebně technologický projekt ayurvédského pavilonu v Počátkách: Construction-technological project of Ayurvedic pavilion in Počátky. [Thesis]. Brno University of Technology; 2020. Available from: http://hdl.handle.net/11012/184412

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation


Brno University of Technology

9. Lisý, Ondřej. Resort Johanka - realizace hrubé vrchní stavby: Resort Johanka - realization of rough upper construction.

Degree: 2019, Brno University of Technology

 The bachelor´s thesis deals with built-in realization with attic accommodation for guests of Resort Johanka´s premises. A new ceiling construction and roofing execution is realized.… (more)

Subjects/Keywords: Vestavba s ubytovacím podkrovím; hrubá vrchní stavba; zastřešení; technická zpráva; ocelové rámy; výkaz výměr; technologický předpis; položkový rozpočet; časový plán; strojní sestava; zařízení staveniště; kontrolní a zkušební plán; bezpečnost práce; built-in with attic accommodation; gross superstructure; roofing; technical report; steel framing; bill of quantities; technological regulation; item budget; schedule; machine setup; construction site equipment; control and test schedule; safety regulation at work

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

Lisý, O. (2019). Resort Johanka - realizace hrubé vrchní stavby: Resort Johanka - realization of rough upper construction. (Thesis). Brno University of Technology. Retrieved from http://hdl.handle.net/11012/84505

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

Chicago Manual of Style (16th Edition):

Lisý, Ondřej. “Resort Johanka - realizace hrubé vrchní stavby: Resort Johanka - realization of rough upper construction.” 2019. Thesis, Brno University of Technology. Accessed February 28, 2021. http://hdl.handle.net/11012/84505.

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

MLA Handbook (7th Edition):

Lisý, Ondřej. “Resort Johanka - realizace hrubé vrchní stavby: Resort Johanka - realization of rough upper construction.” 2019. Web. 28 Feb 2021.

Vancouver:

Lisý O. Resort Johanka - realizace hrubé vrchní stavby: Resort Johanka - realization of rough upper construction. [Internet] [Thesis]. Brno University of Technology; 2019. [cited 2021 Feb 28]. Available from: http://hdl.handle.net/11012/84505.

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

Council of Science Editors:

Lisý O. Resort Johanka - realizace hrubé vrchní stavby: Resort Johanka - realization of rough upper construction. [Thesis]. Brno University of Technology; 2019. Available from: http://hdl.handle.net/11012/84505

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

10. Gao, Zhufeng. Assembly and test operations with multipass requirement in semiconductor manufacturing.

Degree: PhD, Operations Research & Industrial Engineering, 2014, University of Texas – Austin

 In semiconductor manufacturing, wafers are grouped into lots and sent to a separate facility for assembly and test (AT) before being shipped to the customer.… (more)

Subjects/Keywords: Semiconductor manufacturing; Assembly and test; Re-entrant flow; Optimization; Machine setup; Reactive GRASP; Heuristics; Assignment model; Sequencing; Mixed-integer programming; Real-time control

…the machine setup times were sequentially dependent. The objective was to minimize the total… …which is categorized by family type. During machine setup, tooling is placed on the machine… …operate at one temperature, but also be re-setup after the machine finishing all the lots… …SN0806054PWPR, there is preferred setup and four alternatives. The main setup uses machine family ETS… …considers at most one setup for each machine. A critical assumption is that all machines are idle… 

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

Gao, Z. (2014). Assembly and test operations with multipass requirement in semiconductor manufacturing. (Doctoral Dissertation). University of Texas – Austin. Retrieved from http://hdl.handle.net/2152/24901

Chicago Manual of Style (16th Edition):

Gao, Zhufeng. “Assembly and test operations with multipass requirement in semiconductor manufacturing.” 2014. Doctoral Dissertation, University of Texas – Austin. Accessed February 28, 2021. http://hdl.handle.net/2152/24901.

MLA Handbook (7th Edition):

Gao, Zhufeng. “Assembly and test operations with multipass requirement in semiconductor manufacturing.” 2014. Web. 28 Feb 2021.

Vancouver:

Gao Z. Assembly and test operations with multipass requirement in semiconductor manufacturing. [Internet] [Doctoral dissertation]. University of Texas – Austin; 2014. [cited 2021 Feb 28]. Available from: http://hdl.handle.net/2152/24901.

Council of Science Editors:

Gao Z. Assembly and test operations with multipass requirement in semiconductor manufacturing. [Doctoral Dissertation]. University of Texas – Austin; 2014. Available from: http://hdl.handle.net/2152/24901

.