Advanced search options

Advanced Search Options 🞨

Browse by author name (“Author name starts with…”).

Find ETDs with:

in
/  
in
/  
in
/  
in

Written in Published in Earliest date Latest date

Sorted by

Results per page:

Sorted by: relevance · author · university · dateNew search

You searched for subject:(Design Build Operate DBO ). Showing records 1 – 30 of 49095 total matches.

[1] [2] [3] [4] [5] … [1637]

Search Limiters

Last 2 Years | English Only

Degrees

Languages

Country

▼ Search Limiters


University of Colorado

1. Navarro, Desiderio Deno. Correlation between Construction Intensity and the Level of Integration within Design-Bid-Build, Design-Build, and Design-Build-Operate Project Delivery Methods in Water/Wastewater Facility Projects.

Degree: MS, 2011, University of Colorado

 This research compares the Design-Bid-Build (DBB), Design-Build (DB), and Design-Build-Operate (DBO) project delivery methods (PDMs) using the construction intensity (CI) project performance metric. Specifically, the… (more)

Subjects/Keywords: construction intensity; design-bid-build; design-build; design-build-operate; integration; project delivery methods; Civil Engineering

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

Navarro, D. D. (2011). Correlation between Construction Intensity and the Level of Integration within Design-Bid-Build, Design-Build, and Design-Build-Operate Project Delivery Methods in Water/Wastewater Facility Projects. (Masters Thesis). University of Colorado. Retrieved from https://scholar.colorado.edu/cven_gradetds/233

Chicago Manual of Style (16th Edition):

Navarro, Desiderio Deno. “Correlation between Construction Intensity and the Level of Integration within Design-Bid-Build, Design-Build, and Design-Build-Operate Project Delivery Methods in Water/Wastewater Facility Projects.” 2011. Masters Thesis, University of Colorado. Accessed April 24, 2019. https://scholar.colorado.edu/cven_gradetds/233.

MLA Handbook (7th Edition):

Navarro, Desiderio Deno. “Correlation between Construction Intensity and the Level of Integration within Design-Bid-Build, Design-Build, and Design-Build-Operate Project Delivery Methods in Water/Wastewater Facility Projects.” 2011. Web. 24 Apr 2019.

Vancouver:

Navarro DD. Correlation between Construction Intensity and the Level of Integration within Design-Bid-Build, Design-Build, and Design-Build-Operate Project Delivery Methods in Water/Wastewater Facility Projects. [Internet] [Masters thesis]. University of Colorado; 2011. [cited 2019 Apr 24]. Available from: https://scholar.colorado.edu/cven_gradetds/233.

Council of Science Editors:

Navarro DD. Correlation between Construction Intensity and the Level of Integration within Design-Bid-Build, Design-Build, and Design-Build-Operate Project Delivery Methods in Water/Wastewater Facility Projects. [Masters Thesis]. University of Colorado; 2011. Available from: https://scholar.colorado.edu/cven_gradetds/233


Victoria University of Wellington

2. Haddock, Amber. Building information modelling for asset and facilities management.

Degree: 2018, Victoria University of Wellington

 Building Information Modelling (BIM) is an expanding knowledge field driven as a design process within the Architecture, Engineering and Construction industry (AEC). Building Information Models… (more)

Subjects/Keywords: Asset Information Model (AIM); Asset Management (AM); BIM Execution Plan (BEP); BIM Management Plan (BMP); Building Information Modelling (BIM); Common Data Environment (CDE); Construction Management (CM); Construction Operations Building Information Exchange (COBie); Design and Construct (D&C); Design Build (DB); Design Build Operate (DBO); Early Contractor Involvement (ECI); Employer’s information Requirement (EIR); Facilities Management (FM); File Transfer Protocol (FTP); Integrated Project Delivery (IPD); Level of Detail (LoD); Level of Development (LOD); Level of Information (LOI); Mechanical Electrical Plumbing (MEP); Model Element Author (MEA); Model Production Delivery Table (MPDT); Project Implementation Plan (PIP); Project Information Model (PIM); Project Management Plan (PMP); Project Team Integration (PTI); Request for Information (RFI)

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

Haddock, A. (2018). Building information modelling for asset and facilities management. (Masters Thesis). Victoria University of Wellington. Retrieved from http://hdl.handle.net/10063/7887

Chicago Manual of Style (16th Edition):

Haddock, Amber. “Building information modelling for asset and facilities management.” 2018. Masters Thesis, Victoria University of Wellington. Accessed April 24, 2019. http://hdl.handle.net/10063/7887.

MLA Handbook (7th Edition):

Haddock, Amber. “Building information modelling for asset and facilities management.” 2018. Web. 24 Apr 2019.

Vancouver:

Haddock A. Building information modelling for asset and facilities management. [Internet] [Masters thesis]. Victoria University of Wellington; 2018. [cited 2019 Apr 24]. Available from: http://hdl.handle.net/10063/7887.

Council of Science Editors:

Haddock A. Building information modelling for asset and facilities management. [Masters Thesis]. Victoria University of Wellington; 2018. Available from: http://hdl.handle.net/10063/7887


Georgia Tech

3. Bahrami, Shiva. State DOTs’ professional staffing challenges and practices for successful development of design build delivery projects.

Degree: MS, Civil and Environmental Engineering, 2018, Georgia Tech

 This Research studies the practices and challenges in organizational structuring and professional staffing of the Innovative Program Delivery (IPD) units in several state DOTs that… (more)

Subjects/Keywords: Design-build

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

Bahrami, S. (2018). State DOTs’ professional staffing challenges and practices for successful development of design build delivery projects. (Masters Thesis). Georgia Tech. Retrieved from http://hdl.handle.net/1853/59946

Chicago Manual of Style (16th Edition):

Bahrami, Shiva. “State DOTs’ professional staffing challenges and practices for successful development of design build delivery projects.” 2018. Masters Thesis, Georgia Tech. Accessed April 24, 2019. http://hdl.handle.net/1853/59946.

MLA Handbook (7th Edition):

Bahrami, Shiva. “State DOTs’ professional staffing challenges and practices for successful development of design build delivery projects.” 2018. Web. 24 Apr 2019.

Vancouver:

Bahrami S. State DOTs’ professional staffing challenges and practices for successful development of design build delivery projects. [Internet] [Masters thesis]. Georgia Tech; 2018. [cited 2019 Apr 24]. Available from: http://hdl.handle.net/1853/59946.

Council of Science Editors:

Bahrami S. State DOTs’ professional staffing challenges and practices for successful development of design build delivery projects. [Masters Thesis]. Georgia Tech; 2018. Available from: http://hdl.handle.net/1853/59946


University of Windsor

4. Dunn, James. Project Risk Management in Public-Private Partnerships: An Equitable Risk Allocation Decision Model based on Psychometrics.

Degree: MA, Political Science, 2017, University of Windsor

 Public-private partnership (P3) procurement has grown into an internationally acclaimed means of achieving value for money while procuring public infrastructure projects. Unlike conventional infrastructure procurement… (more)

Subjects/Keywords: Alternative Financing and Procurement (AFP); Design-Build-Finance-Operate-Maintain (DBFOM); Private Financing Initiative (PFI); Project Risk Management (PRM); Public-Private Partnership (P3); Risk Mitigation Alternative (RMA)

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

Dunn, J. (2017). Project Risk Management in Public-Private Partnerships: An Equitable Risk Allocation Decision Model based on Psychometrics. (Masters Thesis). University of Windsor. Retrieved from https://scholar.uwindsor.ca/etd/6603

Chicago Manual of Style (16th Edition):

Dunn, James. “Project Risk Management in Public-Private Partnerships: An Equitable Risk Allocation Decision Model based on Psychometrics.” 2017. Masters Thesis, University of Windsor. Accessed April 24, 2019. https://scholar.uwindsor.ca/etd/6603.

MLA Handbook (7th Edition):

Dunn, James. “Project Risk Management in Public-Private Partnerships: An Equitable Risk Allocation Decision Model based on Psychometrics.” 2017. Web. 24 Apr 2019.

Vancouver:

Dunn J. Project Risk Management in Public-Private Partnerships: An Equitable Risk Allocation Decision Model based on Psychometrics. [Internet] [Masters thesis]. University of Windsor; 2017. [cited 2019 Apr 24]. Available from: https://scholar.uwindsor.ca/etd/6603.

Council of Science Editors:

Dunn J. Project Risk Management in Public-Private Partnerships: An Equitable Risk Allocation Decision Model based on Psychometrics. [Masters Thesis]. University of Windsor; 2017. Available from: https://scholar.uwindsor.ca/etd/6603


Hong Kong University of Science and Technology

5. Lai, Junrong. Concession period determination and adjustment for BOT transportation projects.

Degree: 2012, Hong Kong University of Science and Technology

 Public Private Partnerships (PPP) are one of the ways to provide public works and services around the world. For transportation projects under the PPP scheme,… (more)

Subjects/Keywords: Transportation  – Mathematical models; Mathematical optimization; Build-operate-transfer (Public contracts); Concessions

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

Lai, J. (2012). Concession period determination and adjustment for BOT transportation projects. (Thesis). Hong Kong University of Science and Technology. Retrieved from https://doi.org/10.14711/thesis-b1198340 ; http://repository.ust.hk/ir/bitstream/1783.1-7755/1/th_redirect.html

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

Chicago Manual of Style (16th Edition):

Lai, Junrong. “Concession period determination and adjustment for BOT transportation projects.” 2012. Thesis, Hong Kong University of Science and Technology. Accessed April 24, 2019. https://doi.org/10.14711/thesis-b1198340 ; http://repository.ust.hk/ir/bitstream/1783.1-7755/1/th_redirect.html.

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

MLA Handbook (7th Edition):

Lai, Junrong. “Concession period determination and adjustment for BOT transportation projects.” 2012. Web. 24 Apr 2019.

Vancouver:

Lai J. Concession period determination and adjustment for BOT transportation projects. [Internet] [Thesis]. Hong Kong University of Science and Technology; 2012. [cited 2019 Apr 24]. Available from: https://doi.org/10.14711/thesis-b1198340 ; http://repository.ust.hk/ir/bitstream/1783.1-7755/1/th_redirect.html.

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

Council of Science Editors:

Lai J. Concession period determination and adjustment for BOT transportation projects. [Thesis]. Hong Kong University of Science and Technology; 2012. Available from: https://doi.org/10.14711/thesis-b1198340 ; http://repository.ust.hk/ir/bitstream/1783.1-7755/1/th_redirect.html

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation


Victoria University of Wellington

6. Hay, Jonathan. Architectural Indicators.

Degree: 2013, Victoria University of Wellington

 A political crisis is currently underway in New Zealand with a critical lack of affordable well-designed housing. Due to the presence in New Zealand of… (more)

Subjects/Keywords: Craftsmanship; Design-build; Construction

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

Hay, J. (2013). Architectural Indicators. (Masters Thesis). Victoria University of Wellington. Retrieved from http://hdl.handle.net/10063/2858

Chicago Manual of Style (16th Edition):

Hay, Jonathan. “Architectural Indicators.” 2013. Masters Thesis, Victoria University of Wellington. Accessed April 24, 2019. http://hdl.handle.net/10063/2858.

MLA Handbook (7th Edition):

Hay, Jonathan. “Architectural Indicators.” 2013. Web. 24 Apr 2019.

Vancouver:

Hay J. Architectural Indicators. [Internet] [Masters thesis]. Victoria University of Wellington; 2013. [cited 2019 Apr 24]. Available from: http://hdl.handle.net/10063/2858.

Council of Science Editors:

Hay J. Architectural Indicators. [Masters Thesis]. Victoria University of Wellington; 2013. Available from: http://hdl.handle.net/10063/2858


Mississippi State University

7. Kellum, Agrippa Spence. ON THE DESIGN-BUILD OF SMALL PAVILIONS.

Degree: MLA, Landscape Architecture, 2010, Mississippi State University

Design-build is the process whereby a project is constructed by the same entity that designed it. Detailed narratives are provided for the collaborative, integrated… (more)

Subjects/Keywords: collaboration; synthesis; integrated design-build

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

Kellum, A. S. (2010). ON THE DESIGN-BUILD OF SMALL PAVILIONS. (Masters Thesis). Mississippi State University. Retrieved from http://sun.library.msstate.edu/ETD-db/theses/available/etd-07092010-152031/ ;

Chicago Manual of Style (16th Edition):

Kellum, Agrippa Spence. “ON THE DESIGN-BUILD OF SMALL PAVILIONS.” 2010. Masters Thesis, Mississippi State University. Accessed April 24, 2019. http://sun.library.msstate.edu/ETD-db/theses/available/etd-07092010-152031/ ;.

MLA Handbook (7th Edition):

Kellum, Agrippa Spence. “ON THE DESIGN-BUILD OF SMALL PAVILIONS.” 2010. Web. 24 Apr 2019.

Vancouver:

Kellum AS. ON THE DESIGN-BUILD OF SMALL PAVILIONS. [Internet] [Masters thesis]. Mississippi State University; 2010. [cited 2019 Apr 24]. Available from: http://sun.library.msstate.edu/ETD-db/theses/available/etd-07092010-152031/ ;.

Council of Science Editors:

Kellum AS. ON THE DESIGN-BUILD OF SMALL PAVILIONS. [Masters Thesis]. Mississippi State University; 2010. Available from: http://sun.library.msstate.edu/ETD-db/theses/available/etd-07092010-152031/ ;


Addis Ababa University

8. Mekonnen, Asaminew. DESIGN-BUILD VERSUS DESIGN-BID-BUILD PROJECT DELIVERY METHOD IN FEDERAL ROAD CONSTRUCTION PROJECTS .

Degree: 2013, Addis Ababa University

 The Federal Democratic Republic of Ethiopia has placed increased emphasis on improving the quality and size of the road infrastructure. In order to meet this… (more)

Subjects/Keywords: DESIGN-BUILD VERSUS DESIGN-BID-BUILD; PROJECT DELIVERY METHOD

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

Mekonnen, A. (2013). DESIGN-BUILD VERSUS DESIGN-BID-BUILD PROJECT DELIVERY METHOD IN FEDERAL ROAD CONSTRUCTION PROJECTS . (Thesis). Addis Ababa University. Retrieved from http://etd.aau.edu.et/dspace/handle/123456789/5937

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

Chicago Manual of Style (16th Edition):

Mekonnen, Asaminew. “DESIGN-BUILD VERSUS DESIGN-BID-BUILD PROJECT DELIVERY METHOD IN FEDERAL ROAD CONSTRUCTION PROJECTS .” 2013. Thesis, Addis Ababa University. Accessed April 24, 2019. http://etd.aau.edu.et/dspace/handle/123456789/5937.

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

MLA Handbook (7th Edition):

Mekonnen, Asaminew. “DESIGN-BUILD VERSUS DESIGN-BID-BUILD PROJECT DELIVERY METHOD IN FEDERAL ROAD CONSTRUCTION PROJECTS .” 2013. Web. 24 Apr 2019.

Vancouver:

Mekonnen A. DESIGN-BUILD VERSUS DESIGN-BID-BUILD PROJECT DELIVERY METHOD IN FEDERAL ROAD CONSTRUCTION PROJECTS . [Internet] [Thesis]. Addis Ababa University; 2013. [cited 2019 Apr 24]. Available from: http://etd.aau.edu.et/dspace/handle/123456789/5937.

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

Council of Science Editors:

Mekonnen A. DESIGN-BUILD VERSUS DESIGN-BID-BUILD PROJECT DELIVERY METHOD IN FEDERAL ROAD CONSTRUCTION PROJECTS . [Thesis]. Addis Ababa University; 2013. Available from: http://etd.aau.edu.et/dspace/handle/123456789/5937

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation


NSYSU

9. Yeh, Shou-Shan. Research of Implementing Investments Trusts on Urban Renewal.

Degree: Master, EMBA, 2006, NSYSU

 In the past, Taiwanâs economy is growing very fast and city development is flourishing. But with time evolved, the urban development experienced from fast growing… (more)

Subjects/Keywords: Build Operate Transfer; Urban Renewal; Real Estate Investments Trusts

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

Yeh, S. (2006). Research of Implementing Investments Trusts on Urban Renewal. (Thesis). NSYSU. Retrieved from http://etd.lib.nsysu.edu.tw/ETD-db/ETD-search/view_etd?URN=etd-0712106-162721

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

Chicago Manual of Style (16th Edition):

Yeh, Shou-Shan. “Research of Implementing Investments Trusts on Urban Renewal.” 2006. Thesis, NSYSU. Accessed April 24, 2019. http://etd.lib.nsysu.edu.tw/ETD-db/ETD-search/view_etd?URN=etd-0712106-162721.

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

MLA Handbook (7th Edition):

Yeh, Shou-Shan. “Research of Implementing Investments Trusts on Urban Renewal.” 2006. Web. 24 Apr 2019.

Vancouver:

Yeh S. Research of Implementing Investments Trusts on Urban Renewal. [Internet] [Thesis]. NSYSU; 2006. [cited 2019 Apr 24]. Available from: http://etd.lib.nsysu.edu.tw/ETD-db/ETD-search/view_etd?URN=etd-0712106-162721.

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

Council of Science Editors:

Yeh S. Research of Implementing Investments Trusts on Urban Renewal. [Thesis]. NSYSU; 2006. Available from: http://etd.lib.nsysu.edu.tw/ETD-db/ETD-search/view_etd?URN=etd-0712106-162721

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation


NSYSU

10. Pi, Jen-Wen. Study of Taiwan Medical Equipment Build-Operate-Transfer Cases Estimation.

Degree: Master, EMBA, 2011, NSYSU

 The medical equipment market is very competitive in Taiwan, the equipment suppliers in response to the multiplex market changing, and to satisfy with the hospitals… (more)

Subjects/Keywords: the medical equipment market; investment appraisal system; build-operate-transfer (BOT); the equipment suppliers; case study research

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

Pi, J. (2011). Study of Taiwan Medical Equipment Build-Operate-Transfer Cases Estimation. (Thesis). NSYSU. Retrieved from http://etd.lib.nsysu.edu.tw/ETD-db/ETD-search/view_etd?URN=etd-0819111-140141

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

Chicago Manual of Style (16th Edition):

Pi, Jen-Wen. “Study of Taiwan Medical Equipment Build-Operate-Transfer Cases Estimation.” 2011. Thesis, NSYSU. Accessed April 24, 2019. http://etd.lib.nsysu.edu.tw/ETD-db/ETD-search/view_etd?URN=etd-0819111-140141.

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

MLA Handbook (7th Edition):

Pi, Jen-Wen. “Study of Taiwan Medical Equipment Build-Operate-Transfer Cases Estimation.” 2011. Web. 24 Apr 2019.

Vancouver:

Pi J. Study of Taiwan Medical Equipment Build-Operate-Transfer Cases Estimation. [Internet] [Thesis]. NSYSU; 2011. [cited 2019 Apr 24]. Available from: http://etd.lib.nsysu.edu.tw/ETD-db/ETD-search/view_etd?URN=etd-0819111-140141.

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

Council of Science Editors:

Pi J. Study of Taiwan Medical Equipment Build-Operate-Transfer Cases Estimation. [Thesis]. NSYSU; 2011. Available from: http://etd.lib.nsysu.edu.tw/ETD-db/ETD-search/view_etd?URN=etd-0819111-140141

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation


Queensland University of Technology

11. Cheung, Esther. Developing a best practice framework for implementing public private partnerships (PPP) in Hong Kong.

Degree: 2009, Queensland University of Technology

 Public Private Partnership (PPP) is a well established methodology for procuring public works projects. By incorporating the private sector’s expertise, efficiency, innovation, business sense, risk… (more)

Subjects/Keywords: public private partnership (PPP); build operate transfer (BOT); infrastructure; procurement; public works; public sector; private sector; researcher; Hong Kong; Australia

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

Cheung, E. (2009). Developing a best practice framework for implementing public private partnerships (PPP) in Hong Kong. (Thesis). Queensland University of Technology. Retrieved from https://eprints.qut.edu.au/28597/

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

Chicago Manual of Style (16th Edition):

Cheung, Esther. “Developing a best practice framework for implementing public private partnerships (PPP) in Hong Kong.” 2009. Thesis, Queensland University of Technology. Accessed April 24, 2019. https://eprints.qut.edu.au/28597/.

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

MLA Handbook (7th Edition):

Cheung, Esther. “Developing a best practice framework for implementing public private partnerships (PPP) in Hong Kong.” 2009. Web. 24 Apr 2019.

Vancouver:

Cheung E. Developing a best practice framework for implementing public private partnerships (PPP) in Hong Kong. [Internet] [Thesis]. Queensland University of Technology; 2009. [cited 2019 Apr 24]. Available from: https://eprints.qut.edu.au/28597/.

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

Council of Science Editors:

Cheung E. Developing a best practice framework for implementing public private partnerships (PPP) in Hong Kong. [Thesis]. Queensland University of Technology; 2009. Available from: https://eprints.qut.edu.au/28597/

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

12. Sieng, Pikol. La contribution des techniques contractuelles à la promotion des investissements internationaux au Cambodge : l'exemple du contrat build-operate-transfer (BOT) : The contribution of contractual techniques to promote international investments in Cambodia : the case of build-operate-transfer (BOT) contract.

Degree: Docteur es, Droit international privé, 2014, Université Jean Moulin – Lyon III

Cette thèse propose une étude globale sur les contrats build-operate-transfer (BOT). Ils sont traités dans leurs aspects financiers, juridiques et contractuels. Les investissements dans les… (more)

Subjects/Keywords: Infrastructure; Build-Operate-Transfer; Concession; Construction; Fidic; Exploitation; Arbitrage CIRDI; Droit des investissements; Financement de projet; Finance islamique; Cambodge; Asean; Infrastructure; Build-Operate-Transfer; Concession; Construction; Fidic; Operation; ICSID arbitration; Investment law; Project finance; Islamic finance; Cambodia; Asean; 340

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

Sieng, P. (2014). La contribution des techniques contractuelles à la promotion des investissements internationaux au Cambodge : l'exemple du contrat build-operate-transfer (BOT) : The contribution of contractual techniques to promote international investments in Cambodia : the case of build-operate-transfer (BOT) contract. (Doctoral Dissertation). Université Jean Moulin – Lyon III. Retrieved from http://www.theses.fr/2014LYO30092

Chicago Manual of Style (16th Edition):

Sieng, Pikol. “La contribution des techniques contractuelles à la promotion des investissements internationaux au Cambodge : l'exemple du contrat build-operate-transfer (BOT) : The contribution of contractual techniques to promote international investments in Cambodia : the case of build-operate-transfer (BOT) contract.” 2014. Doctoral Dissertation, Université Jean Moulin – Lyon III. Accessed April 24, 2019. http://www.theses.fr/2014LYO30092.

MLA Handbook (7th Edition):

Sieng, Pikol. “La contribution des techniques contractuelles à la promotion des investissements internationaux au Cambodge : l'exemple du contrat build-operate-transfer (BOT) : The contribution of contractual techniques to promote international investments in Cambodia : the case of build-operate-transfer (BOT) contract.” 2014. Web. 24 Apr 2019.

Vancouver:

Sieng P. La contribution des techniques contractuelles à la promotion des investissements internationaux au Cambodge : l'exemple du contrat build-operate-transfer (BOT) : The contribution of contractual techniques to promote international investments in Cambodia : the case of build-operate-transfer (BOT) contract. [Internet] [Doctoral dissertation]. Université Jean Moulin – Lyon III; 2014. [cited 2019 Apr 24]. Available from: http://www.theses.fr/2014LYO30092.

Council of Science Editors:

Sieng P. La contribution des techniques contractuelles à la promotion des investissements internationaux au Cambodge : l'exemple du contrat build-operate-transfer (BOT) : The contribution of contractual techniques to promote international investments in Cambodia : the case of build-operate-transfer (BOT) contract. [Doctoral Dissertation]. Université Jean Moulin – Lyon III; 2014. Available from: http://www.theses.fr/2014LYO30092


Universidad de Chile

13. Garvs Martínez, Joshua Gunther. Diseño e implementación de una experiencia para talleres de introducción a la ingeniería .

Degree: 2014, Universidad de Chile

 La malla de Plan Común de ingeniería y ciencias de la Facultad de Ciencias Físicas y Matemáticas de la Universidad de Chile, determina que los… (more)

Subjects/Keywords: Ingeniería; Ingeniería - Enseñanza; Conceive, design, implement and operate; Arduino; Cdio

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

Garvs Martínez, J. G. (2014). Diseño e implementación de una experiencia para talleres de introducción a la ingeniería . (Thesis). Universidad de Chile. Retrieved from http://repositorio.uchile.cl/handle/2250/131046

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

Chicago Manual of Style (16th Edition):

Garvs Martínez, Joshua Gunther. “Diseño e implementación de una experiencia para talleres de introducción a la ingeniería .” 2014. Thesis, Universidad de Chile. Accessed April 24, 2019. http://repositorio.uchile.cl/handle/2250/131046.

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

MLA Handbook (7th Edition):

Garvs Martínez, Joshua Gunther. “Diseño e implementación de una experiencia para talleres de introducción a la ingeniería .” 2014. Web. 24 Apr 2019.

Vancouver:

Garvs Martínez JG. Diseño e implementación de una experiencia para talleres de introducción a la ingeniería . [Internet] [Thesis]. Universidad de Chile; 2014. [cited 2019 Apr 24]. Available from: http://repositorio.uchile.cl/handle/2250/131046.

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

Council of Science Editors:

Garvs Martínez JG. Diseño e implementación de una experiencia para talleres de introducción a la ingeniería . [Thesis]. Universidad de Chile; 2014. Available from: http://repositorio.uchile.cl/handle/2250/131046

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation


University of Colorado

14. Won, Spencer Jongsik. A General Performance Model for Design-Build Highway Pavement.

Degree: PhD, 2011, University of Colorado

  New challenges are revealed as more projects are delivered and contracted through innovative methods such as design-build project delivery and performance-based specifications. One challenge… (more)

Subjects/Keywords: design-build; performance model; warranty; Civil Engineering

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

Won, S. J. (2011). A General Performance Model for Design-Build Highway Pavement. (Doctoral Dissertation). University of Colorado. Retrieved from https://scholar.colorado.edu/cven_gradetds/210

Chicago Manual of Style (16th Edition):

Won, Spencer Jongsik. “A General Performance Model for Design-Build Highway Pavement.” 2011. Doctoral Dissertation, University of Colorado. Accessed April 24, 2019. https://scholar.colorado.edu/cven_gradetds/210.

MLA Handbook (7th Edition):

Won, Spencer Jongsik. “A General Performance Model for Design-Build Highway Pavement.” 2011. Web. 24 Apr 2019.

Vancouver:

Won SJ. A General Performance Model for Design-Build Highway Pavement. [Internet] [Doctoral dissertation]. University of Colorado; 2011. [cited 2019 Apr 24]. Available from: https://scholar.colorado.edu/cven_gradetds/210.

Council of Science Editors:

Won SJ. A General Performance Model for Design-Build Highway Pavement. [Doctoral Dissertation]. University of Colorado; 2011. Available from: https://scholar.colorado.edu/cven_gradetds/210


Delft University of Technology

15. Straehle, L.K. Pavilions for Okana: From landscape to roofscape:.

Degree: 2016, Delft University of Technology

 The goals of the Design & Build project were to design a prototypical pavilion structure for multifunctional public use in the rural areas around Lake… (more)

Subjects/Keywords: Pavilions; bamboo construction; Kenya; Okana; design build

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

Straehle, L. K. (2016). Pavilions for Okana: From landscape to roofscape:. (Masters Thesis). Delft University of Technology. Retrieved from http://resolver.tudelft.nl/uuid:1fde7fc0-88e7-49a3-886f-d140fabaa649

Chicago Manual of Style (16th Edition):

Straehle, L K. “Pavilions for Okana: From landscape to roofscape:.” 2016. Masters Thesis, Delft University of Technology. Accessed April 24, 2019. http://resolver.tudelft.nl/uuid:1fde7fc0-88e7-49a3-886f-d140fabaa649.

MLA Handbook (7th Edition):

Straehle, L K. “Pavilions for Okana: From landscape to roofscape:.” 2016. Web. 24 Apr 2019.

Vancouver:

Straehle LK. Pavilions for Okana: From landscape to roofscape:. [Internet] [Masters thesis]. Delft University of Technology; 2016. [cited 2019 Apr 24]. Available from: http://resolver.tudelft.nl/uuid:1fde7fc0-88e7-49a3-886f-d140fabaa649.

Council of Science Editors:

Straehle LK. Pavilions for Okana: From landscape to roofscape:. [Masters Thesis]. Delft University of Technology; 2016. Available from: http://resolver.tudelft.nl/uuid:1fde7fc0-88e7-49a3-886f-d140fabaa649

16. ALBUQUERQUE, Ana Elisabete Cavalcanti de. Uma avaliação comparativa entre os métodos design-build e o design-bid-build para redução de problemas entre projeto e contrução de obras públicas brasileiras .

Degree: 2012, Universidade Federal de Pernambuco

 Este estudo objetiva identificar as contribuições do método design-build, bem como riscos envolvidos na sua adoção, com vistas à minimização de problemas entre projeto e… (more)

Subjects/Keywords: Projeto e construção; Design-Build; Design-Bid-Build; Riscos; Contratação; Empreendimentos Públicos

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

ALBUQUERQUE, A. E. C. d. (2012). Uma avaliação comparativa entre os métodos design-build e o design-bid-build para redução de problemas entre projeto e contrução de obras públicas brasileiras . (Thesis). Universidade Federal de Pernambuco. Retrieved from http://repositorio.ufpe.br/handle/123456789/10182

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

Chicago Manual of Style (16th Edition):

ALBUQUERQUE, Ana Elisabete Cavalcanti de. “Uma avaliação comparativa entre os métodos design-build e o design-bid-build para redução de problemas entre projeto e contrução de obras públicas brasileiras .” 2012. Thesis, Universidade Federal de Pernambuco. Accessed April 24, 2019. http://repositorio.ufpe.br/handle/123456789/10182.

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

MLA Handbook (7th Edition):

ALBUQUERQUE, Ana Elisabete Cavalcanti de. “Uma avaliação comparativa entre os métodos design-build e o design-bid-build para redução de problemas entre projeto e contrução de obras públicas brasileiras .” 2012. Web. 24 Apr 2019.

Vancouver:

ALBUQUERQUE AECd. Uma avaliação comparativa entre os métodos design-build e o design-bid-build para redução de problemas entre projeto e contrução de obras públicas brasileiras . [Internet] [Thesis]. Universidade Federal de Pernambuco; 2012. [cited 2019 Apr 24]. Available from: http://repositorio.ufpe.br/handle/123456789/10182.

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

Council of Science Editors:

ALBUQUERQUE AECd. Uma avaliação comparativa entre os métodos design-build e o design-bid-build para redução de problemas entre projeto e contrução de obras públicas brasileiras . [Thesis]. Universidade Federal de Pernambuco; 2012. Available from: http://repositorio.ufpe.br/handle/123456789/10182

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation


Missouri University of Science and Technology

17. Chen, Hongyan. Two essays on the domain translation from financial options to real options.

Degree: PhD, Engineering Management, Missouri University of Science and Technology

  "Real options (ROs) extend the financial option pricing theory to the valuation of real asset investment and managerial flexibility under uncertainty. However, differences between… (more)

Subjects/Keywords: Build-operate-transfer (BOT); Operations Research, Systems Engineering and Industrial Engineering

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

Chen, H. (n.d.). Two essays on the domain translation from financial options to real options. (Doctoral Dissertation). Missouri University of Science and Technology. Retrieved from http://scholarsmine.mst.edu/doctoral_dissertations/86

Note: this citation may be lacking information needed for this citation format:
No year of publication.

Chicago Manual of Style (16th Edition):

Chen, Hongyan. “Two essays on the domain translation from financial options to real options.” Doctoral Dissertation, Missouri University of Science and Technology. Accessed April 24, 2019. http://scholarsmine.mst.edu/doctoral_dissertations/86.

Note: this citation may be lacking information needed for this citation format:
No year of publication.

MLA Handbook (7th Edition):

Chen, Hongyan. “Two essays on the domain translation from financial options to real options.” Web. 24 Apr 2019.

Note: this citation may be lacking information needed for this citation format:
No year of publication.

Vancouver:

Chen H. Two essays on the domain translation from financial options to real options. [Internet] [Doctoral dissertation]. Missouri University of Science and Technology; [cited 2019 Apr 24]. Available from: http://scholarsmine.mst.edu/doctoral_dissertations/86.

Note: this citation may be lacking information needed for this citation format:
No year of publication.

Council of Science Editors:

Chen H. Two essays on the domain translation from financial options to real options. [Doctoral Dissertation]. Missouri University of Science and Technology; Available from: http://scholarsmine.mst.edu/doctoral_dissertations/86

Note: this citation may be lacking information needed for this citation format:
No year of publication.


Iowa State University

18. West, Nicola Jane Newsham. Evaluating the value of contractor involvement in the design phase.

Degree: 2012, Iowa State University

 The use of alternative project delivery methods for transportation projects has grown in the in the U.S. out of a necessity to upgrade a rapidly… (more)

Subjects/Keywords: Alternative project delivery methods; Construction manager/general contractor; Design-bid-build; Design-build; Design fee; Preconstruction; Civil Engineering

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

West, N. J. N. (2012). Evaluating the value of contractor involvement in the design phase. (Thesis). Iowa State University. Retrieved from https://lib.dr.iastate.edu/etd/12512

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

Chicago Manual of Style (16th Edition):

West, Nicola Jane Newsham. “Evaluating the value of contractor involvement in the design phase.” 2012. Thesis, Iowa State University. Accessed April 24, 2019. https://lib.dr.iastate.edu/etd/12512.

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

MLA Handbook (7th Edition):

West, Nicola Jane Newsham. “Evaluating the value of contractor involvement in the design phase.” 2012. Web. 24 Apr 2019.

Vancouver:

West NJN. Evaluating the value of contractor involvement in the design phase. [Internet] [Thesis]. Iowa State University; 2012. [cited 2019 Apr 24]. Available from: https://lib.dr.iastate.edu/etd/12512.

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

Council of Science Editors:

West NJN. Evaluating the value of contractor involvement in the design phase. [Thesis]. Iowa State University; 2012. Available from: https://lib.dr.iastate.edu/etd/12512

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation


Victoria University of Wellington

19. Saunders, Samuel. Machining Ornament: An investigation into contemporary machining practices and the creation of patterned ornamental surfaces.

Degree: 2018, Victoria University of Wellington

 Robotic tools open a new frontier in surface articulation. The combination of computer modelling with robotic tools allows the transfer of digital information onto physical… (more)

Subjects/Keywords: Architecture; Design; Ornament; Machining; Parametric design; Cultural design; Prototypes; Design and build; Robotics; Group design

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

Saunders, S. (2018). Machining Ornament: An investigation into contemporary machining practices and the creation of patterned ornamental surfaces. (Masters Thesis). Victoria University of Wellington. Retrieved from http://hdl.handle.net/10063/7006

Chicago Manual of Style (16th Edition):

Saunders, Samuel. “Machining Ornament: An investigation into contemporary machining practices and the creation of patterned ornamental surfaces.” 2018. Masters Thesis, Victoria University of Wellington. Accessed April 24, 2019. http://hdl.handle.net/10063/7006.

MLA Handbook (7th Edition):

Saunders, Samuel. “Machining Ornament: An investigation into contemporary machining practices and the creation of patterned ornamental surfaces.” 2018. Web. 24 Apr 2019.

Vancouver:

Saunders S. Machining Ornament: An investigation into contemporary machining practices and the creation of patterned ornamental surfaces. [Internet] [Masters thesis]. Victoria University of Wellington; 2018. [cited 2019 Apr 24]. Available from: http://hdl.handle.net/10063/7006.

Council of Science Editors:

Saunders S. Machining Ornament: An investigation into contemporary machining practices and the creation of patterned ornamental surfaces. [Masters Thesis]. Victoria University of Wellington; 2018. Available from: http://hdl.handle.net/10063/7006


Penn State University

20. Mosemann, David. SUSTAINABLE OR NOT? A CASE STUDY CHALLENGING TRADITIONAL ARCHITECTURAL DESIGN EDUCATION THROUGH HUMANITARIAN DESIGN.

Degree: M. Arch., Architecture, 2011, Penn State University

 A report by UN-HABITAT in 2003 stated that by 2030 there could be 3 billion people living in states of impoverishment throughout the world, requiring… (more)

Subjects/Keywords: collaborative design; design thinking; sustainable development; humanitarian design; architectural education; socially conscious design; design build

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

Mosemann, D. (2011). SUSTAINABLE OR NOT? A CASE STUDY CHALLENGING TRADITIONAL ARCHITECTURAL DESIGN EDUCATION THROUGH HUMANITARIAN DESIGN. (Masters Thesis). Penn State University. Retrieved from https://etda.libraries.psu.edu/catalog/11900

Chicago Manual of Style (16th Edition):

Mosemann, David. “SUSTAINABLE OR NOT? A CASE STUDY CHALLENGING TRADITIONAL ARCHITECTURAL DESIGN EDUCATION THROUGH HUMANITARIAN DESIGN.” 2011. Masters Thesis, Penn State University. Accessed April 24, 2019. https://etda.libraries.psu.edu/catalog/11900.

MLA Handbook (7th Edition):

Mosemann, David. “SUSTAINABLE OR NOT? A CASE STUDY CHALLENGING TRADITIONAL ARCHITECTURAL DESIGN EDUCATION THROUGH HUMANITARIAN DESIGN.” 2011. Web. 24 Apr 2019.

Vancouver:

Mosemann D. SUSTAINABLE OR NOT? A CASE STUDY CHALLENGING TRADITIONAL ARCHITECTURAL DESIGN EDUCATION THROUGH HUMANITARIAN DESIGN. [Internet] [Masters thesis]. Penn State University; 2011. [cited 2019 Apr 24]. Available from: https://etda.libraries.psu.edu/catalog/11900.

Council of Science Editors:

Mosemann D. SUSTAINABLE OR NOT? A CASE STUDY CHALLENGING TRADITIONAL ARCHITECTURAL DESIGN EDUCATION THROUGH HUMANITARIAN DESIGN. [Masters Thesis]. Penn State University; 2011. Available from: https://etda.libraries.psu.edu/catalog/11900


University of California – Berkeley

21. Chih, Ying-Yi. A Decision-Support Framework for Choosing a Project Delivery System (PDS) in a Multi-Project Environment.

Degree: Civil and Environmental Engineering, 2010, University of California – Berkeley

 The use of an appropriate Project Delivery System (PDS) can significantly increase the project efficiency and success rate. Designing a PDS however is a difficult… (more)

Subjects/Keywords: Civil Engineering; Construction Management at Risk; Decision-Support Framework; Design-Bid-Build; Design-Build; Infrastructure Projects; Project Delivery Systems

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

Chih, Y. (2010). A Decision-Support Framework for Choosing a Project Delivery System (PDS) in a Multi-Project Environment. (Thesis). University of California – Berkeley. Retrieved from http://www.escholarship.org/uc/item/76j9q5pk

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

Chicago Manual of Style (16th Edition):

Chih, Ying-Yi. “A Decision-Support Framework for Choosing a Project Delivery System (PDS) in a Multi-Project Environment.” 2010. Thesis, University of California – Berkeley. Accessed April 24, 2019. http://www.escholarship.org/uc/item/76j9q5pk.

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

MLA Handbook (7th Edition):

Chih, Ying-Yi. “A Decision-Support Framework for Choosing a Project Delivery System (PDS) in a Multi-Project Environment.” 2010. Web. 24 Apr 2019.

Vancouver:

Chih Y. A Decision-Support Framework for Choosing a Project Delivery System (PDS) in a Multi-Project Environment. [Internet] [Thesis]. University of California – Berkeley; 2010. [cited 2019 Apr 24]. Available from: http://www.escholarship.org/uc/item/76j9q5pk.

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

Council of Science Editors:

Chih Y. A Decision-Support Framework for Choosing a Project Delivery System (PDS) in a Multi-Project Environment. [Thesis]. University of California – Berkeley; 2010. Available from: http://www.escholarship.org/uc/item/76j9q5pk

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation


Colorado State University

22. Bashettiyavar, Gautham. Comparing claims and disputes performance between traditional project delivery method and alternate project delivery methods.

Degree: MS(M.S.), Construction Management, 2018, Colorado State University

 Claims and disputes are common in construction projects and the costs associated with these adversarial relationships can reach up to $4-12 billion per year. While… (more)

Subjects/Keywords: Claims and Dispute; Design Bid Build; Project Delivery Methods; CM/GC; Alternate Project delivery methods; Design Build

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

Bashettiyavar, G. (2018). Comparing claims and disputes performance between traditional project delivery method and alternate project delivery methods. (Masters Thesis). Colorado State University. Retrieved from http://hdl.handle.net/10217/189362

Chicago Manual of Style (16th Edition):

Bashettiyavar, Gautham. “Comparing claims and disputes performance between traditional project delivery method and alternate project delivery methods.” 2018. Masters Thesis, Colorado State University. Accessed April 24, 2019. http://hdl.handle.net/10217/189362.

MLA Handbook (7th Edition):

Bashettiyavar, Gautham. “Comparing claims and disputes performance between traditional project delivery method and alternate project delivery methods.” 2018. Web. 24 Apr 2019.

Vancouver:

Bashettiyavar G. Comparing claims and disputes performance between traditional project delivery method and alternate project delivery methods. [Internet] [Masters thesis]. Colorado State University; 2018. [cited 2019 Apr 24]. Available from: http://hdl.handle.net/10217/189362.

Council of Science Editors:

Bashettiyavar G. Comparing claims and disputes performance between traditional project delivery method and alternate project delivery methods. [Masters Thesis]. Colorado State University; 2018. Available from: http://hdl.handle.net/10217/189362


Texas A&M University

23. Radhakrishnan Nair Sindhu, Jayakrishnan. Investigating the Effect of Front-End Planning in Fast-Track Delivery Systems for Industrial Projects.

Degree: 2016, Texas A&M University

 Numerous research studies to date have been conducted to examine the processes and effectiveness of Front-End Planning. However, very little is known about the impact… (more)

Subjects/Keywords: Front-End Planning; Design-Build; CM-at-Risk

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

Radhakrishnan Nair Sindhu, J. (2016). Investigating the Effect of Front-End Planning in Fast-Track Delivery Systems for Industrial Projects. (Thesis). Texas A&M University. Retrieved from http://hdl.handle.net/1969.1/157077

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

Chicago Manual of Style (16th Edition):

Radhakrishnan Nair Sindhu, Jayakrishnan. “Investigating the Effect of Front-End Planning in Fast-Track Delivery Systems for Industrial Projects.” 2016. Thesis, Texas A&M University. Accessed April 24, 2019. http://hdl.handle.net/1969.1/157077.

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

MLA Handbook (7th Edition):

Radhakrishnan Nair Sindhu, Jayakrishnan. “Investigating the Effect of Front-End Planning in Fast-Track Delivery Systems for Industrial Projects.” 2016. Web. 24 Apr 2019.

Vancouver:

Radhakrishnan Nair Sindhu J. Investigating the Effect of Front-End Planning in Fast-Track Delivery Systems for Industrial Projects. [Internet] [Thesis]. Texas A&M University; 2016. [cited 2019 Apr 24]. Available from: http://hdl.handle.net/1969.1/157077.

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

Council of Science Editors:

Radhakrishnan Nair Sindhu J. Investigating the Effect of Front-End Planning in Fast-Track Delivery Systems for Industrial Projects. [Thesis]. Texas A&M University; 2016. Available from: http://hdl.handle.net/1969.1/157077

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation


Georgia Tech

24. Lee, Jung Hyun. Changes in quality management approaches for design-build highway projects.

Degree: MS, Building Construction, 2018, Georgia Tech

 The purpose of this study is to determine changes in quality management approaches of design-build (DB) highway projects compared to those in design-bid-build (DBB) projects.… (more)

Subjects/Keywords: Quality management; Design-build; Highway project; Quality assurance

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

Lee, J. H. (2018). Changes in quality management approaches for design-build highway projects. (Masters Thesis). Georgia Tech. Retrieved from http://hdl.handle.net/1853/59960

Chicago Manual of Style (16th Edition):

Lee, Jung Hyun. “Changes in quality management approaches for design-build highway projects.” 2018. Masters Thesis, Georgia Tech. Accessed April 24, 2019. http://hdl.handle.net/1853/59960.

MLA Handbook (7th Edition):

Lee, Jung Hyun. “Changes in quality management approaches for design-build highway projects.” 2018. Web. 24 Apr 2019.

Vancouver:

Lee JH. Changes in quality management approaches for design-build highway projects. [Internet] [Masters thesis]. Georgia Tech; 2018. [cited 2019 Apr 24]. Available from: http://hdl.handle.net/1853/59960.

Council of Science Editors:

Lee JH. Changes in quality management approaches for design-build highway projects. [Masters Thesis]. Georgia Tech; 2018. Available from: http://hdl.handle.net/1853/59960

25. Chahrour, Lara. Analysis of Risks and Cost Overruns in Design-Bid-Build Highway Infrastructure Projects in Ontario.

Degree: 2017, University of Waterloo

 Cost overruns commonly occur in infrastructure projects, and when the owner is a government entity, these overruns may disrupt the funding available for other projects.… (more)

Subjects/Keywords: highway infrastructure; risk identification; cost overrun; design-bid-build; risk management

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

Chahrour, L. (2017). Analysis of Risks and Cost Overruns in Design-Bid-Build Highway Infrastructure Projects in Ontario. (Thesis). University of Waterloo. Retrieved from http://hdl.handle.net/10012/12472

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

Chicago Manual of Style (16th Edition):

Chahrour, Lara. “Analysis of Risks and Cost Overruns in Design-Bid-Build Highway Infrastructure Projects in Ontario.” 2017. Thesis, University of Waterloo. Accessed April 24, 2019. http://hdl.handle.net/10012/12472.

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

MLA Handbook (7th Edition):

Chahrour, Lara. “Analysis of Risks and Cost Overruns in Design-Bid-Build Highway Infrastructure Projects in Ontario.” 2017. Web. 24 Apr 2019.

Vancouver:

Chahrour L. Analysis of Risks and Cost Overruns in Design-Bid-Build Highway Infrastructure Projects in Ontario. [Internet] [Thesis]. University of Waterloo; 2017. [cited 2019 Apr 24]. Available from: http://hdl.handle.net/10012/12472.

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

Council of Science Editors:

Chahrour L. Analysis of Risks and Cost Overruns in Design-Bid-Build Highway Infrastructure Projects in Ontario. [Thesis]. University of Waterloo; 2017. Available from: http://hdl.handle.net/10012/12472

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation


Delft University of Technology

26. Rouwendal, E. Pavilions for Okana: From landscape to roofscape :.

Degree: 2016, Delft University of Technology

 Pavilions for Okana is a Design-Build-Studio that combines a theoretical and a practical part. The design consists of pilot pavilions for multifunctional public use in… (more)

Subjects/Keywords: Design-Build-Studio; Kenya; bamboo construction; community Centre; prototype

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

Rouwendal, E. (2016). Pavilions for Okana: From landscape to roofscape :. (Masters Thesis). Delft University of Technology. Retrieved from http://resolver.tudelft.nl/uuid:daa99966-7331-43e9-9709-da8390a24721

Chicago Manual of Style (16th Edition):

Rouwendal, E. “Pavilions for Okana: From landscape to roofscape :.” 2016. Masters Thesis, Delft University of Technology. Accessed April 24, 2019. http://resolver.tudelft.nl/uuid:daa99966-7331-43e9-9709-da8390a24721.

MLA Handbook (7th Edition):

Rouwendal, E. “Pavilions for Okana: From landscape to roofscape :.” 2016. Web. 24 Apr 2019.

Vancouver:

Rouwendal E. Pavilions for Okana: From landscape to roofscape :. [Internet] [Masters thesis]. Delft University of Technology; 2016. [cited 2019 Apr 24]. Available from: http://resolver.tudelft.nl/uuid:daa99966-7331-43e9-9709-da8390a24721.

Council of Science Editors:

Rouwendal E. Pavilions for Okana: From landscape to roofscape :. [Masters Thesis]. Delft University of Technology; 2016. Available from: http://resolver.tudelft.nl/uuid:daa99966-7331-43e9-9709-da8390a24721


Brno University of Technology

27. Paníček, Patrik. Metoda Design-Build a její použití pro zadávání v ČR .

Degree: 2019, Brno University of Technology

 Tato diplomová práce se zabývá zadáváním veřejných zakázek metodou Design-Build. První část je zaměřena na popis jednotlivých zadávacích metod a jejich výhod a nevýhod. Dále… (more)

Subjects/Keywords: Veřejná zakázka; stavební práce; metody dodávky; Design-Build; Design-Bid-Build; FIDIC; Yellow Book; smluvní podmínky; technické podmínky; nabídková cena; hodnotící kritéria.; Public procurement; construction work; project delivery system; Design-Build; Design-Bid-Build; FIDIC; Yellow Book; terms and conditions; technical conditions; offer price; evaluation criteria.

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

Paníček, P. (2019). Metoda Design-Build a její použití pro zadávání v ČR . (Thesis). Brno University of Technology. Retrieved from http://hdl.handle.net/11012/137755

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

Chicago Manual of Style (16th Edition):

Paníček, Patrik. “Metoda Design-Build a její použití pro zadávání v ČR .” 2019. Thesis, Brno University of Technology. Accessed April 24, 2019. http://hdl.handle.net/11012/137755.

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

MLA Handbook (7th Edition):

Paníček, Patrik. “Metoda Design-Build a její použití pro zadávání v ČR .” 2019. Web. 24 Apr 2019.

Vancouver:

Paníček P. Metoda Design-Build a její použití pro zadávání v ČR . [Internet] [Thesis]. Brno University of Technology; 2019. [cited 2019 Apr 24]. Available from: http://hdl.handle.net/11012/137755.

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

Council of Science Editors:

Paníček P. Metoda Design-Build a její použití pro zadávání v ČR . [Thesis]. Brno University of Technology; 2019. Available from: http://hdl.handle.net/11012/137755

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation


Loughborough University

28. Haroglu, Hasan. Investigating the structural frame decision making process.

Degree: Thesis (Eng.D.), 2010, Loughborough University

 Structural frames are widely used in sectors such as residential, education, commercial, health, retail, leisure etc. and the selection of a structural frame appropriate to… (more)

Subjects/Keywords: 624.17; Structural frame; Decision making; Design-build; Procurement; Building; Contractor

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

Haroglu, H. (2010). Investigating the structural frame decision making process. (Doctoral Dissertation). Loughborough University. Retrieved from https://dspace.lboro.ac.uk/2134/5969 ; https://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.512111

Chicago Manual of Style (16th Edition):

Haroglu, Hasan. “Investigating the structural frame decision making process.” 2010. Doctoral Dissertation, Loughborough University. Accessed April 24, 2019. https://dspace.lboro.ac.uk/2134/5969 ; https://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.512111.

MLA Handbook (7th Edition):

Haroglu, Hasan. “Investigating the structural frame decision making process.” 2010. Web. 24 Apr 2019.

Vancouver:

Haroglu H. Investigating the structural frame decision making process. [Internet] [Doctoral dissertation]. Loughborough University; 2010. [cited 2019 Apr 24]. Available from: https://dspace.lboro.ac.uk/2134/5969 ; https://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.512111.

Council of Science Editors:

Haroglu H. Investigating the structural frame decision making process. [Doctoral Dissertation]. Loughborough University; 2010. Available from: https://dspace.lboro.ac.uk/2134/5969 ; https://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.512111


Purdue University

29. Aguilera, Giovanny. Characterization of particle emission from desktop 3D printers: A look at the effect of part design and build pathing.

Degree: MSME, Mechanical Engineering, 2016, Purdue University

 3D Printing has been heralded as a revolutionary technology that can change manufacturing and design in the foreseeable future. One of the most popular forms… (more)

Subjects/Keywords: 3D Printing; Build Path; Design; Emissions; Part feature; Particles

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

Aguilera, G. (2016). Characterization of particle emission from desktop 3D printers: A look at the effect of part design and build pathing. (Thesis). Purdue University. Retrieved from https://docs.lib.purdue.edu/open_access_theses/1217

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

Chicago Manual of Style (16th Edition):

Aguilera, Giovanny. “Characterization of particle emission from desktop 3D printers: A look at the effect of part design and build pathing.” 2016. Thesis, Purdue University. Accessed April 24, 2019. https://docs.lib.purdue.edu/open_access_theses/1217.

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

MLA Handbook (7th Edition):

Aguilera, Giovanny. “Characterization of particle emission from desktop 3D printers: A look at the effect of part design and build pathing.” 2016. Web. 24 Apr 2019.

Vancouver:

Aguilera G. Characterization of particle emission from desktop 3D printers: A look at the effect of part design and build pathing. [Internet] [Thesis]. Purdue University; 2016. [cited 2019 Apr 24]. Available from: https://docs.lib.purdue.edu/open_access_theses/1217.

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

Council of Science Editors:

Aguilera G. Characterization of particle emission from desktop 3D printers: A look at the effect of part design and build pathing. [Thesis]. Purdue University; 2016. Available from: https://docs.lib.purdue.edu/open_access_theses/1217

Note: this citation may be lacking information needed for this citation format:
Not specified: Masters Thesis or Doctoral Dissertation

30. Ghadimi, Behshad. Impact of Delivery Method on Stakeholder Issues and Involvement Practices in Mega Projects: Evidence from Fixed Crossing Case Studies.

Degree: PhD, Civil and Environmental Engineering, 2017, Virginia Tech

 As the scale and scope of infrastructure projects have increased, so too has the array of stakeholders either involved or impacted. Such projects often take… (more)

Subjects/Keywords: public-private partnership; megaprojects; design-build; stakeholder involvement; NEPA requirements

Record DetailsSimilar RecordsGoogle PlusoneFacebookTwitterCiteULikeMendeleyreddit

APA · Chicago · MLA · Vancouver · CSE | Export to Zotero / EndNote / Reference Manager

APA (6th Edition):

Ghadimi, B. (2017). Impact of Delivery Method on Stakeholder Issues and Involvement Practices in Mega Projects: Evidence from Fixed Crossing Case Studies. (Doctoral Dissertation). Virginia Tech. Retrieved from http://hdl.handle.net/10919/76668

Chicago Manual of Style (16th Edition):

Ghadimi, Behshad. “Impact of Delivery Method on Stakeholder Issues and Involvement Practices in Mega Projects: Evidence from Fixed Crossing Case Studies.” 2017. Doctoral Dissertation, Virginia Tech. Accessed April 24, 2019. http://hdl.handle.net/10919/76668.

MLA Handbook (7th Edition):

Ghadimi, Behshad. “Impact of Delivery Method on Stakeholder Issues and Involvement Practices in Mega Projects: Evidence from Fixed Crossing Case Studies.” 2017. Web. 24 Apr 2019.

Vancouver:

Ghadimi B. Impact of Delivery Method on Stakeholder Issues and Involvement Practices in Mega Projects: Evidence from Fixed Crossing Case Studies. [Internet] [Doctoral dissertation]. Virginia Tech; 2017. [cited 2019 Apr 24]. Available from: http://hdl.handle.net/10919/76668.

Council of Science Editors:

Ghadimi B. Impact of Delivery Method on Stakeholder Issues and Involvement Practices in Mega Projects: Evidence from Fixed Crossing Case Studies. [Doctoral Dissertation]. Virginia Tech; 2017. Available from: http://hdl.handle.net/10919/76668

[1] [2] [3] [4] [5] … [1637]

.